My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASIC BID SCHEDULE E ITEMS (Water Main and Appurtenances) <br /> ITEM PLAN ITEM DESCRIPTION UNIT PRICE TOTAL AMOUNT <br /> I NO. QUANTITY (Figures) (Figures) <br /> At <br /> E10 4 Tapping Sleeve and Valve Assembly,2- <br /> Each Inch <br /> Per Each <br /> At <br /> I Ell 3 Hydrant Assembly <br /> Each <br /> Per Each <br /> At <br /> E12 20 Corporation Stop w/Service Saddle, 3/4- <br /> ' Inch <br /> Each <br /> Per Each <br /> At <br /> E13 5 Corporation Stop w/Service Saddle, 1- <br /> 1Each Inch <br /> Per Each <br /> At <br /> E14 930 Water Service,3/4-Inch <br /> Linear Feet <br /> ' Per Linear Foot <br /> At <br /> I E15 240 Water Service, 1-Inch <br /> Linear Feet <br /> Per Linear Foot <br /> ' At <br /> E16 210 Water Service,2-Inch <br /> ' Linear Feet S <br /> Per Linear Foot <br /> ' At <br /> E17 25 Repl Wtr Meter Box, %-Inch and 1- <br /> Each Inch <br /> ' Per Each <br /> At <br /> E18 4 Repl Wtr Meter Box,2-Inch <br /> ' Each <br /> Per Each <br /> City of Everett Page 30 Bid Proposal <br /> IEverett Downtown Streetscape Improvement April 12, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.