My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASIC BID SCHEDULE E ITEMS (Water Main and Appurtenances) <br /> IITEM PLAN ITEM DESCRIPTION UNIT PRICE TOTAL AMOUNT <br /> NO. QUANTITY (Figures) (Figures) <br /> ' At <br /> E19 90 Ductile Iron Pipe for Water Main, 4- <br /> Linear Feet Inch Diam. <br /> tPer Linear Foot <br /> At <br /> ' E20 60 Ductile Iron Pipe for Water Main, 6- <br /> Inch Diam. <br /> Linear Feet <br /> Per Linear Feet <br /> ' At <br /> E21 1 Gate Valve,4-Inch <br /> ' Each <br /> Per Each <br /> I <br /> At <br /> E22 1 Gate Valve,6-Inch <br /> Each <br /> Per Each <br /> At <br /> E23 5 Connect to Existing Water Main, 8- <br /> Inch <br /> Each <br /> Per Each <br /> At <br /> ' E24 3 Connect to Existing Water Main, 12- <br /> Inch <br /> Each <br /> Per Each <br /> 1 <br /> I <br /> City of Everett Page 30A Bid Proposal <br /> Everett Downtown Streetscape Improvement April 12, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.