My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Option 2 (performance based paint system): <br /> 2 <br /> 3 Primer Coat— Inorganic Zinc Rich 9-08.1(2)M <br /> 4 Intermediate Coat— Epoxy 9-08.1(2)M • <br /> 5 Intermediate Stripe Coat— Epoxy 9-08.1(2)M <br /> 6 Top Coat— Polyurethane 9-08.1(2)M I 7 <br /> 8 The following new paragraph is inserted after the first paragraph: <br /> 9 <br /> I <br /> 10 Paints and related materials shall be products listed in the current WSDOT Qualified <br /> 11 Products List (QPL). Component based paint systems shall be listed on the QPL in the <br /> 12 applicable sections of Section 9-08. Performance based systems shall be listed on the <br /> 13 current Northeast Protective Coatings Committee (NEPCOAT) Qualified Products List "A" <br /> I <br /> 14 as listed on the WSDOT QPL in Section 9-08.1(2)M. If the paint and related materials for <br /> 15 the component based system is not listed in the current WSDOT QPL, a sample shall be <br /> 16 submitted to the State Materials Laboratory in Tumwater for evaluation and acceptance in I 17 accordance with Section 9-08. <br /> 18 <br /> 19 6-07.3(9)C Mixing and Thinning Paint <br /> I <br /> 20 This section is revised to read: <br /> 21 <br /> 22 The Contractor shall thoroughly mix paint in accordance with the manufacturer's written I 23 recommendations and by mechanical means to ensure a uniform and lump free <br /> 24 composition. Paint shall not be mixed by means of air stream bubbling or boxing. Paint <br /> 25 shall be mixed in the original containers and mixing shall continue until all pigment or 11126 metallic powder is in suspension. Care shall be taken to ensure that the solid material that <br /> 27 has settled to the bottom of the container is thoroughly dispersed. After mixing, the <br /> 28 Contractor shall inspect the paint for uniformity and to ensure that no unmixed pigment or <br /> 29 lumps are present. <br /> 30 <br /> 31 Catalysts, curing agents, hardeners, initiators, or dry metallic powders that are packaged <br /> 32 separately may be added to the base paint in accordance with the paint manufacturer's <br /> I <br /> 33 written recommendations and only after the paint is thoroughly mixed to achieve a uniform <br /> 34 mixture with all particles wetted. The Contractor shall then add the proper volume of curing <br /> 35 agent to the correct volume of base and mix thoroughly. The mixture shall be used within <br /> I <br /> 36 the pot life specified by the manufacturer. Unused portions shall be discarded at the end of <br /> 37 each work day. Accelerants are not permitted except as allowed by the Engineer. <br /> 38 <br /> I <br /> 39 The Contractor shall not add additional thinner at the application site except as allowed by <br /> 40 the Engineer. The amount and type of thinner, if allowed, shall conform to the <br /> 41 manufacturer's specifications. If recommended by the manufacturer and allowed by the <br /> I <br /> 42 Engineer, a measuring cup shall be used for the addition of thinner to any paint with <br /> 43 graduations in ounces. No un-measured addition of thinner to paint will be allowed. Any <br /> 44 paint found to be thinned by unacceptable methods will be rejected. <br /> 45 <br /> I <br /> 46 When recommended by the manufacturer, the Contractor shall constantly agitate paint <br /> 47 during application by use of paint pots equipped with mechanical agitators. <br /> 48 <br /> I <br /> 49 The Contractor shall strain all paint after mixing to remove undesirable matter, but without <br /> 50 removing the pigment or metallic powder. <br /> 51 <br /> I <br /> City of Everett Page AM-44 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.