Laserfiche WebLink
I <br /> 1 Scarification, and removal of the upper layer of concrete overlay when present, may <br /> 2 proceed during the final cleaning and overlay placement phases of the Work on adjacent <br /> 3 portions of the Structure so long as the scarification and concrete overlay removal <br /> 4 operations are confined to areas which are a minimum of 100 feet away from the defined <br /> 5 limits of the final cleaning or overlay placement in progress. If the scarification and concrete <br /> 6 overlay removal impedes or interferes in any way with the final cleaning or overlay <br /> 7 placement as determined by the Engineer, the scarification and concrete overlay removal <br /> 8 Work shall be terminated immediately and the scarification and concrete overlay removal <br /> 9 equipment removed sufficiently away from the area being prepared or overlaid to eliminate <br /> 10 the conflict. If the grade is such that water and contaminants from the scarification and <br /> 11 concrete overlay removal operation will flow into the area being prepared or overlaid, the <br /> 12 scarification and concrete overlay removal operation shall be terminated and shall remain <br /> 13 suspended for the first 24 hours of curing time after the completion of concrete placement. I <br /> 14 <br /> 15 6-09.3(11) Placing Concrete Overlay <br /> 16 The first sentence of item number 3 in the fourth paragraph is revised to read: <br /> 17 <br /> 18 Concrete shall not be placed when the temperature of the concrete surface is less than <br /> 19 45°F or greater than 75°F, and wind velocity at the construction site is in excess of 10 mph. <br /> 20 <br /> 21 6-09.3(12) Finishing Concrete Overlay <br /> 22 The third paragraph is deleted. <br /> 23 <br /> 24 The last paragraph is deleted. <br /> 25 <br /> 26 6-09.3(13) Curing Concrete Overlay <br /> 27 The first sentence of the first paragraph is revised to read: <br /> 28 <br /> 29 As the finishing operation progresses, the concrete shall be immediately covered with a <br /> 30 single layer of clean, new or used, wet burlap. <br /> 31 <br /> 32 The last sentence of the second paragraph is deleted. I <br /> 33 <br /> 34 The following two new paragraphs are inserted after the second paragraph: <br /> 35 <br /> 36 As an alternative to the application of burlap and fog spraying described above, the <br /> 37 Contractor may propose a curing system using proprietary curing blankets specifically <br /> 38 manufactured for bridge deck curing. The Contractor shall submit a Type 2 Working <br /> 39 Drawing consisting of details of the proprietary curing blanket system, including product <br /> 40 literature and details of how the system is to be installed and maintained. <br /> 41 <br /> 42 The wet curing regimen as described shall remain in place for a minimum of 42-hours. <br /> 43 <br /> 44 The last paragraph is deleted. <br /> 45 <br /> 46 6-09.3(14) Checking for Bond <br /> 47 The first sentence of the first paragraph is revised to read: <br /> 48 I <br /> City of Everett Page AM-60 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />