Laserfiche WebLink
I <br /> I1 ii. The proposed elevation of soil surface receiving the wastewater for <br /> 2 infiltration and the anticipated phreatic surface (i.e., saturated soil). <br /> I <br /> 3 <br /> 4 •iii. The source of the water used to produce the slurry. <br /> 5 <br /> 6 iv. The estimated total volume of wastewater to be infiltrated. <br /> I7 <br /> 8 v. The accepted flocculant to be used (if any). <br /> 9 <br /> 1 10 vi. The controls or methods used to prevent surface wastewater runoff from <br /> 11 leaving the infiltration location. <br /> 12 <br /> I13 vii. The strategy for removing slurry wastewater from the shaft and <br /> 14 containing the slurry wastewater once it has been removed from the <br /> 15 shaft. <br /> I 16 <br /> 111 17 viii. The strategy for monitoring infiltration activity and adapting methods to <br /> 18 ensure compliance. <br /> I19 <br /> 20 ix. A contingency plan that can be implemented immediately if it becomes <br /> 21 evident that the controls in place or methods being used are not <br /> 22 adequate. <br /> 23 <br /> 24 x. The strategy for cleaning up the infiltration location after the infiltration <br /> 25 activity is done. Cleanup shall include stabilizing any loose sediment on <br /> I26 the surface within the infiltration area generated as a byproduct of <br /> 27 suspended solids in the infiltrated wastewater or soil disturbance <br /> 28 associated with BMP placement and removal. <br /> I29 <br /> 30 2. Shaft drilling mineral slurry, synthetic slurry, or slurry with polymer additives not <br /> 31 allowed for infiltration shall be contained and disposed of by the Contractor at an <br /> ▪ 32 accepted disposal facility in accordance with Section 2-03.3(7)C. Spoils that have <br /> ▪ 33 come into contact with mineral slurry shall be disposed of in accordance with <br /> 34 Section 6-19.3(4)F. <br /> I35 <br /> 36 8-01.3(1)C4 Management of Off-Site Water <br /> 37 This section is revised to read: <br /> I 38 <br /> 39 Prior to clearing and grubbing, the Contractor shall intercept all sources of off-site surface <br /> 40 water and overland flow that will run-on to the project. Off-site surface water run-on shall be <br /> 41 diverted through or around the project in a way that does not introduce construction related <br /> I42 pollution. It shall be diverted to its preconstruction discharge location in a manner that does <br /> 43 not increase preconstruction flow rate and velocity and protects contiguous properties and <br /> 44 waterways from erosion. The Contractor shall submit a Type 2 Working Drawing consisting <br /> I45 of the method for performing this Work. <br /> 46 <br /> 47 8-01.3(1)E Detention/Retention Pond Construction <br /> I48 This section is revised to read: <br /> 49 <br /> 50 Whether permanent or temporary, ponds shall be constructed before beginning other <br /> 1 51 grading and excavation Work in the area that drains into that pond. Detention/retention <br /> City of Everett Page AM-71 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />