My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 Biodegradable erosion control blanket and plastic covering will be measured by the <br /> 2 square yard along the ground slope line of surface area covered and accepted. <br /> I3 <br /> 4 Turbidity curtains will be measured by the linear foot along the ground line of the • <br /> 5 installed curtain. <br /> I6 <br /> 7 Check dams will be measured per linear foot one time only along the ground line of the <br /> 8 completed check dam. No additional measurement will be made for check dams that <br /> 9 are required to be rehabilitated or replaced due to wear. <br /> I10 <br /> 11 Stabilized construction entrances will be measured by the square yard by ground slope <br /> 12 measurement for each entrance constructed. <br /> I13 <br /> 14 Tire wash facilities will be measured per each for each tire wash installed. <br /> 15 <br /> I16 Street cleaning will be measured by the hour for the actual time spent cleaning <br /> 17 pavement, refilling with water, dumping and transport to and from cleaning locations <br /> 18 within the project limits, as authorized by the Engineer. Time to mobilize the equipment <br /> 19 to or from the project limits on which street cleaning is required will not be measured. <br /> 20 <br /> 21 Inlet protections will be measured per each for each initial installation at a <br /> I22 drainage structure. <br /> 23 <br /> 24 Silt fence, gravel filter, compost berms, and wood chip berms will be measured by <br /> 25 the linear foot along the ground line of the completed barrier. <br /> I26 <br /> 27 Wattles and compost socks will be measured by the linear foot. <br /> 28 <br /> I29 Temporary curbs will be measured by the linear foot along the ground line of the <br /> 30 completed installation. <br /> 31 <br /> 32 Temporary pipe slope drains will be measured by the linear foot along the flow line of <br /> II 33 the pipe. <br /> 34 <br /> I35 Coir logs will be measured by the linear foot along the ground line of the completed <br /> 36 installation. <br /> 37 <br /> I38 Outlet protections will be measured per each initial installation at an outlet location. <br /> 39 <br /> 40 Tackifiers will be measure by the acre by ground slope measurement. <br /> 41 <br /> I42 8-01.4(3) Reinstating Unit Items with Lump Sum Erosion Control and Water Pollution <br /> 43 Prevention <br /> 44 The Contract Provisions may establish the project as lump sum, in accordance with Section <br /> I45 8-01.4(1) and also include one or more of the items included above in Section 8-01.4(2). <br /> 46 When that occurs, the corresponding measurement provision in Section 8-01.4(2) is not <br /> 47 deleted and the Work under that item will be measured as specified. <br /> 1 48 <br /> i <br /> City of Everett Page AM-75 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.