Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 unless otherwise allowed by the Engineer. When the temporary BMP materials are made of <br /> 2 natural plant fibers unaltered by synthetic materials the Engineer may allow leaving the <br /> 3 BMP in place. <br /> 4 <br /> 5 The Contractor shall remove BMPs and associated hardware in a way that minimizes soil <br /> 6 disturbance. The Contractor shall permanently stabilize all bare and disturbed soil after <br /> 7 removal of BMPs. If the installation and use of the erosion control BMPs have compacted <br /> 8 or otherwise rendered the soil inhospitable to plant growth, such as construction entrances, <br /> 9 the Contractor shall take measures to rehabilitate the soil to facilitate plant growth. This <br /> 10 may include, but is not limited to, ripping the soil, incorporating soil amendments, or <br /> 11 seeding with the specified seed. <br /> 12 <br /> 13 At the request of the Contractor and at the sole discretion of the Engineer the CSWGP may I <br /> 14 be transferred back to the Contracting Agency. Approval of the Transfer of Coverage <br /> 15 request will require the following: <br /> 16 <br /> 17 1. All other Work required for Contract Completion has been completed. <br /> 18 <br /> 19 2. All Work required for compliance with the CSWGP has been completed to the <br /> 111 <br /> 20 maximum extent possible. This includes removal of BMPs that are no longer <br /> 21 needed and the site has undergone all Stabilization identified for meeting the <br /> 22 requirements of Final Stabilization in the CSWGP. <br /> 23 <br /> 24 3. An Equitable Adjustment change order for the cost of Work that has not been <br /> 25 completed by the Contractor. <br /> 26 <br /> 27 4. Submittal of the Washington State Department of Ecology Transfer of Coverage <br /> 28 form (Ecology form ECY 020-87a) to the Engineer. <br /> 29111 30 If the Engineer approves the transfer of coverage back to the Contracting Agency, the <br /> 31 requirement in Section 1-07.5(3) for the Contractor's submittal of the Notice of Termination <br /> 32 form to the Washington State Department of Ecology will not apply. <br /> 33 <br /> 34 8-01.4 Measurement <br /> 35 This section's content is deleted and replaced with the following new subsections: <br /> 36 <br /> 37 8-01.4(1) Lump Sum Bid for Project (No Unit Items) <br /> 38 When the Bid Proposal contains the item "Erosion Control and Water Pollution Prevention" <br /> 39 there will be no measurement of unit or force account items for Work defined in Section 8- <br /> 40 01 except as described in Sections 8-01.4(3) and 8-01.4(4). Also, except as described in <br /> 41 Section 8-01.4(3), all of Sections 8-01.4(2) and 8-01.5(2) are deleted. <br /> 421 <br /> 43 8-01.4(2) Item Bids <br /> 44 When the Proposal does not contain the items "Erosion Control and Water Pollution <br /> 45 Prevention", Section 8-01.4(1) and 8-01.5(1) are deleted and the Bid Proposal will contain <br /> 46 some or all of the following items measured as noted. <br /> 47 <br /> 48 ESC lead will be measured per day for each day that an inspection is made and a <br /> 49 report is filed. <br /> 50 <br /> City of Everett Page AM-74 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />