Laserfiche WebLink
I <br /> I1 The unit Contract price for "Plant Selection ", per each shall be full pay for all Work to <br /> 2 perform the work as specified within the planting area prior to planting for weed control, <br /> 3 planting area preparation and installation of plants with initial watering. <br /> I4 <br /> 5 The paragraph following the Bid item "PSIPE ", per each is revised to read: <br /> 6 <br /> 17 7 The unit Contract price for "PSIPE ", per each, shall be full pay for all Work to perform <br /> 8 the work as specified within the planting area for weed control and planting area <br /> 9 preparation, planting, cleanup, and water necessary to complete planting operations as <br /> I10 specified to the end of first year plant establishment. <br /> 11 <br /> 12 Section 8-04, Curbs, Gutters, and Spillways <br /> I13 April 2, 2018 <br /> 14 8-04.2 Materials <br /> 15 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> I16 <br /> 17 Cement 9-01 <br /> 18 <br /> ▪ 19 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways <br /> ▪ 20 The first paragraph is supplemented with the following: <br /> 21 <br /> in 22 Roundabout truck apron cement concrete curb and gutter shall be constructed with air <br /> 23 entrained concrete Class 4000 conforming to the requirements of Section 6-02. <br /> 24 <br /> I25 Section 8-06, Cement Concrete Driveway Entrances <br /> 26 April 2, 2018 <br /> 27 8-06.2 Materials <br /> I28 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 29 <br /> 30 Cement 9-01 <br /> 31 <br /> I32 8-06.3 Construction Requirements <br /> 33 The first paragraph is revised to read: <br /> 34 <br /> t35 Cement concrete driveway approaches shall be constructed with air entrained concrete <br /> 36 Class 4000 conforming to the requirements of Section 6-02 or Portland Cement or Blended <br /> 37 Hydraulic Cement Concrete Pavement conforming to the requirements of Section 5-05. <br /> I38 <br /> 39 Section 8-07, Precast Traffic Curb <br /> 40 April 2, 2018 <br /> I41 8-07.3(1) Installing Curbs <br /> 42 The first sentence of the first paragraph is revised to read: <br /> 43 <br /> 44 The curb shall be firmly bedded for its entire length and breadth on a mortar bed <br /> • 45 conforming to Section 9-20.4(3) composed of one part Portland cement or blended <br /> 46 hydraulic cement and two parts sand. <br /> 147 <br /> 48 The fourth paragraph is revised to read: <br /> 49 <br /> I <br /> City of Everett Page AM-79 Amendments <br /> 1 Everett Downtown Streetscape Improvement March 22, 2019 <br />