Laserfiche WebLink
1 <br /> 1 All joints between adjacent pieces of curb except joints for expansion and/or drainage as <br /> 2 designated by the Engineer shall be filled with mortar composed of one part Portland <br /> 3 cement or blended hydraulic cement and two parts sand. <br /> 4 <br /> 5 Section 8-11, Guardrail <br /> 6 August 6, 2018 <br /> 7 8-11.3(1)C Terminal and Anchor Installation <br /> 8 The first paragraph is revised to read: <br /> 9 <br /> 10 All excavation and backfilling required for installation of anchors shall be performed in111 <br /> 11 accordance with Section 2-09, except that the costs thereof shall be included in the unit <br /> 12 Contract price for the anchor installed. <br /> 13 <br /> 14 The first sentence of the second to last paragraph is revised to read: <br /> 15 <br /> 16 Assembly and installation of Beam Guardrail Non-flared Terminals for Type 31 guardrail 1 <br /> 17 shall be supervised at all times by a manufacturer's representative, or an installer who has <br /> 18 been trained and certified by the manufacturer. <br /> 19 <br /> 20 The last paragraph is revised to read: <br /> 21 <br /> 22 Beam Guardrail Non-flared Terminals for Type 31 guardrail shall meet the crash test and <br /> 23 evaluation criteria in the Manual for Assessing Safety Hardware (MASH). <br /> 24 <br /> 25 8-11.4 Measurement <br /> 26 The third paragraph is revised to read: <br /> 27 <br /> 28 Measurement of beam guardrail terminal will be per each for the completed terminal. <br /> 29 <br /> 30 The fourth paragraph is revised to read: <br /> 31 <br /> 32 Measurement of beam guardrail Type 31 buried terminal Type 2 will be per linear foot for 1 <br /> 33 the completed terminal. <br /> 34 <br /> 35 The sixth paragraph is revised to read: <br /> 36 <br /> 37 Measurement of beam guardrail anchor Type 10 will be per each for the completed anchor, <br /> 38 including the attachment of the anchor to the guardrail. <br /> 39 <br /> 40 8-11.5 Payment <br /> 41 The Bid item "Beam Guardrail Anchor Type ", per each is revised to read "Beam Guardrail <br /> 42 Anchor Type 10", per each. <br /> 43 <br /> 44 The Bid item "Beam Guardrail Buried Terminal Type 1", per each is deleted from this section. <br /> 45 <br /> 46 The Bid item "Beam Guardrail Buried Terminal Type 2", per linear foot and the following <br /> 47 paragraph are revised to read: <br /> 48 <br /> 49 "Beam Guardrail Type 31 Buried Terminal Type 2", per linear foot. <br /> 50 <br /> 111 <br /> City of Everett Page AM-80 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />