My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1 The unit Contract price per linear foot for "Beam Guardrail Type 31 Buried Terminal Type 2" <br /> 2 shall be full payment for all costs to obtain and provide materials and perform the Work as <br /> I3 described in Section 8-11.3(1)C. <br /> 4 <br /> 5 Section 8-14, Cement Concrete Sidewalks <br /> I6 April 2, 2018 <br /> 7 8-14.2 Materials <br /> 8 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> I9 <br /> 10 Cement 9-01 <br /> 11 <br /> 12 In the second paragraph, each reference to "Federal Standard 595" is revised to read "SAE <br /> I13 AMS Standard 595". <br /> 14 <br /> 15 Section 8-16, Concrete Slope Protection <br /> I16 April 2, 2018 <br /> 17 8-16.2 Materials <br /> 18 In the first paragraph, the last two material references are revised to read: <br /> I19 <br /> 20 Poured Portland Cement or Blended Hydraulic Cement <br /> 21 Concrete Slope Protection 9-13.5(2) <br /> I22 Pneumatically Placed Portland Cement or Blended <br /> 23 Hydraulic Cement Concrete Slope Protection 9-13.5(3) <br /> 24 <br /> ▪ 25 Section 8-17, Impact Attenuator Systems <br /> ▪ 26 January 7, 2019 <br /> 27 8-17.3 Construction Requirements <br /> I28 This section is supplemented with the following: <br /> 29 <br /> 30 Permanent impact attenuators shall meet the crash test and evaluation criteria of the <br /> I31 Manual for Assessing Safety Hardware (MASH), except as otherwise noted in the Plans or <br /> 32 Special Provisions. <br /> 33 <br /> a34 Section 8-20, Illumination, Traffic Signal Systems, Intelligent Transportation <br /> 35 Systems, and Electrical <br /> 36 August 6, 2018 <br /> ▪ 37 8-20.1(1) Regulations and Code <br /> ▪ 38 The last paragraph is revised to read: <br /> 39 <br /> I40 Persons performing electrical Work shall be certified in accordance with and supervised as <br /> 41 required by RCW 19.28.161. Proof of certification shall be worn at all times in accordance <br /> 42 with WAC 296-46B-942. Persons failing to meet these certification requirements may not <br /> 43 perform any electrical work, and shall stop any active electrical work, until their certification <br /> I44 is provided and worn in accordance with this Section. <br /> 45 <br /> 46 8-20.2(2) Equipment List and Drawings <br /> I47 This section is renumbered: <br /> 48 <br /> I <br /> City of Everett Page AM-81 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.