My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 -38 ' <br /> 2019 Biosolids Removal UT3705-2 <br /> for Work done by each Subcontractor through 9.6.1, 9.6.2, 9.6.3,and 9.6.4,to compensate for all <br /> administrative costs, including project Overhead, general company Overhead, profit, bonding, insurance, <br /> Business&Occupation tax, and any other costs incurred. <br /> A firm may be considered to be acting as a Subcontractor when the Owner's Representative observes one <br /> or more of the following characteristics: <br /> 1. The person in charge of the firm's activities takes an active role in managing the overall project, , <br /> including extensive coordination, interpretation of Drawings, interaction with the Contracting <br /> Agency or management of a complex and interrelated operation. <br /> 2. Rented equipment is provided fueled, operated and maintained by the firm. Operators of rented <br /> equipment are supervised directly by the firm's representative. There is a little interaction <br /> between the Contractor and the employees of the firm. <br /> 3. The firm appears to be holding the risk of performance and quality of the Work. <br /> 4. The firm appears to be responsible for liability arising from the Work. <br /> Markups on Work Performed by Subcontractor(s): , <br /> On amounts paid for Work performed <br /> by each Subcontractor on each <br /> Force Account and calculated Up to $25.0000 12% <br /> through 9.6.1-4 <br /> On amounts greater than $25,000 up to$100,000 10% <br /> On amounts greater than $100,000 7% <br /> The amounts and markup rates shall be calculated separately for each Subcontractor on each Force <br /> Account item established. <br /> The payments provided above shall be full payment for all Work done on a Force Account basis. The <br /> calculated payment shall cover all expenses of every nature,kind and description, including those listed <br /> above and any others incurred on the Work being paid through Force Account. Nothing in this provision <br /> shall preclude the Contractor from seeking an extension of time or time-related damages to unchanged <br /> Work arising as a result of Force Account Work. The amount and costs of any work to be paid by Force <br /> Account shall be computed by the Owner's Representative and the result shall be final as provided in 3.2 <br /> OWNER'S REPRESENTATIVE. <br /> An item that has been bid at a unit price or lump sum in the Bid will not be paid as Force Account unless <br /> a change, as defined in ARTICLE 6. CHANGES,has occurred and the provisions require a payment <br /> adjustment. Items which are included in the Bid as Force Account or which are added by change order as <br /> Force Account may,by agreement of the parties at any time, be converted to agreed unit prices•or lump <br /> sums applicable to the remaining Work. ' <br /> 9.7. RETAINAGE <br /> Pursuant to RCW Chap. 60.28, a sum of five percent(5%)of the monies earned by the Contractor will be <br /> retained from progress estimates. In addition to protecting the interests of those identified in RCW Chap. <br /> 60.28, such retainage shall be used as a trust fund for the protection of the Owner. <br /> At the option of the Contractor; monies retained under the provisions of RCW 60.28 shall be: ' <br /> 1. Retained in a fund by the Owner, or <br /> 2. Deposited by the Owner in an escrow(interest-bearing)account in a bank, mutual saving bank, or <br /> savings and loan association(interest on monies so retained shall be paid to the Contractor). <br /> Deposits are to be in the name of the Owner and may not be withdrawn without the Owner's <br /> written authorization. The Owner will issue a check representing the sum of the monies reserved, <br /> payable to the bank or trust company. Such check shall be converted into bonds and securities <br /> 00 7200 - 38 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.