My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 37 <br /> 2019 Biosolids Removal UT3705-2 <br /> 9.6.3. Equipment. <br /> The equipment rates shall be actual cost but shall not exceed the rates set forth in the AGC/WSDOT <br /> Equipment Rental Agreement in effect at the time the Work is performed, <br /> The approval of the Owner's Representative shall be required for the selection of machine-power tools or <br /> equipment prior to their use in Force Account situations. <br /> ' The payment for any machine-power tools or equipment shall be made according to the current <br /> AGC/WSDOT Equipment Rental Agreement in effect at the time the Force Account is authorized. The <br /> rates as set forth in the Rental Rate Blue Book(as modified by the current AGC/WSDOT Equipment <br /> Rental Agreement) are the maximum rates allowable for equipment of modern design and in good <br /> working condition. These rates shall be full compensation for all fuel, oil, lubrication,repairs, <br /> maintenance, and all other costs incidental to furnishing and operating the equipment except labor for <br /> ' operation. <br /> The Owner will add twenty-one(21)percent to equipment costs to cover Project Overhead, general <br /> company Overhead(excluding equipment Overhead included in the Rental Rate Blue Book), and profit. <br /> Current copies of the Rental Rate Blue Book and the AGC/WSDOT Equipment Rental Agreement will be <br /> maintained at each region office of the Washington State Department of Transportation and at each of the <br /> offices of the Associated General Contractors of America, in Seattle, Spokane, Tacoma, Washington and <br /> Wilsonville, Oregon,where they are available for inspection. <br /> 9.6.4. For Services. <br /> Compensation under Force Account for specialized services shall be made on the basis of an invoice from <br /> the providing entity. A"specialized service" shall be one that is typically billed through invoice in <br /> standard industry practice. Before Work is started,the Owner's Representative may require the <br /> Contractor to obtain multiple quotations for the service to be utilized and select the provider with prices <br /> and terms most advantageous to the Owner. In the event that prior quotations are not obtained and the <br /> service invoice is submitted by the Subcontractor,then after-the-fact quotations may be obtained by the <br /> ' Owner's Representative from the open market in the vicinity and the lowest such quotation may be used <br /> in place of the submitted invoice. <br /> Except as noted below,the Owner will pay the Contractor an additional twenty-one(21)percent of the <br /> sum of the costs included on invoices for specialized services to cover project Overhead, general <br /> company Overhead,profit, bonding, insurance,Business&Occupation tax, and other costs incurred. <br /> When a Supplier of services is compensated through invoice,but acts in the manner of Subcontractor, as <br /> described in 9.6.6.For Contractor Markup of Subcontractors Work of this provision,then markup for <br /> that invoice shall be according to 9.6.6.For Contractor Markup of Subcontractors Work. <br /> ' 9.6.5. For Mobilization. <br /> Force Account mobilization is defined as the preparatory work performed by the Contractor including <br /> procurement, loading and transportation of tools and equipment, and personal travel time,when such <br /> travel time is a contractual obligation of the Contractor or a customary payment for the Contractor to all <br /> employees. Mobilization also includes the costs incurred during demobilization applies to both Force <br /> Account and other Contract Work. Owner will pay for mobilization for off-site preparatory work for <br /> Force Account items provided that Notice has been provided sufficiently in advance to allow the Owner's <br /> Representative to witness the activity, if desired. <br /> Any costs experienced during mobilization activities for labor, equipment, materials or services shall be <br /> listed in that section of the Force Account summary and paid accordingly. <br /> 9.6.6. For Contractor Markup on Subcontractor's Work. <br /> When Work is performed on a Force Account basis by one or more approved Subcontractors, by lower- <br /> tier Subcontractors or Suppliers, or through invoice by firm(s)acting in the manner of a Subcontractor, <br /> the Contractor will be allowed an additional markup,from the table below, applied to the costs computed <br /> 00 7200 - 37 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.