My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 1100 - 3 <br /> 2019 Biosolids Removal UT3705-2 <br /> r1.9 CODES AND STANDARD SPECIFICATIONS <br /> A. All construction shall be in accordance with the International Building Code, Current <br /> Adopted Edition. <br /> ' B. All construction shall be in accordance with the Uniform Mechanical Code, and the <br /> Uniform Plumbing Code, latest editions. <br /> C. All construction shall be in conformance with the WSDOT/APWA Standard <br /> Specifications and Standard Plans, latest edition. <br /> D. All construction shall be in conformance with the City of Everett Design and Construction <br /> 1 Standards and Specifications, latest edition. <br /> E. All work shall comply with applicable requirements of Snohomish County. <br /> F. Any material specified by reference to the number, symbol, or title of a specified <br /> standards, such as Commercial Standard Federal Specifications, a trade association <br /> ' standard, or other similar standard, shall comply with the requirements of the latest <br /> revision thereof, and any amendment or supplement thereto in effect on the date of <br /> Invitation for Bids, except as limited to type, class or grade, or modified in such <br /> references. All work shall conform to the standard referred to, except as modified in <br /> these specifications and the drawings. <br /> 1.10 CONTRACTOR'S USE OF PREMISES <br /> A. The Contractor shall assume full responsibility for protection and safekeeping of products <br /> under this Contract. <br /> B. The Contractor shall obtain and pay for use of additional parking, storage or work areas <br /> needed for his/her operations. <br /> 111 <br /> 1.11 CHECKING PLANS AND SPECIFICATIONS <br /> A. PRIOR SUBMISSION OF BIDS: The Contractor shall report any discrepancies or <br /> omissions in the plans and/or specifications to the Architect for a decision prior to the <br /> Submission of Bids. <br /> B. RESOLUTION OF CONFLICTS: Where there is conflict between the plans and the <br /> ' specifications in regard to materials, equipment, sizes, numbers or locations, the Owner <br /> shall be the sole judge in resolving the conflict. <br /> PART 2 - PRODUCTS (Not Used) <br /> ' PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 01 1100 <br /> 01 1100 - 3 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.