My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 2213 - 1 <br /> 2019 Biosolids Removal UT3705-2 <br /> SECTION 01 2213 — MEASUREMENT AND PAYMENT <br /> PART 1 - GENERAL <br /> A. SUMMARY <br /> 1. Unit price bid items measured in tons must be weighed and tested for solids <br /> content, and that information submitted to the Project Manager, prior to or <br /> concurrent with any application for payment. The minimum allowable solids <br /> content of any material loaded into a truck for weighing and transportation to the <br /> designated area on the Biosolids Pad shall be 28% Total Solids (TS). <br /> 1 B. REFERENCES <br /> 1. Section 00 7200 — GENERAL CONDITIONS 1.1 DEFINITIONS OF WORDS <br /> AND TERMS: <br /> DRY WEIGHT <br /> DRY TON <br /> WET WEIGHT <br /> TOTAL SOLIDS <br /> 2. Section 01 4523 — MATERIAL SAMPLING <br /> C. BID ITEMS <br /> 1. Item #1- MOBILIZATION AND DEMOBILIZATION (Lump Sum) <br /> a. The lump sum price Mobilization and Demobilization shall be full <br /> compensation for the Work consisting of the preparatory Work and <br /> operations in mobilizing for beginning Work on the Contract, including, but <br /> ' not limited to, movement of those personnel, equipment, supplies and <br /> incidentals to the project site, preparation of submittals, and for the <br /> establishment of temporary offices, phone service, equipment and first aid <br /> supplies, field surveys, sanitation needs and all other facilities required by <br /> these specifications, and State and local laws and regulations. The costs of <br /> bonds, permits, and any required insurance, and any other preconstruction <br /> ' expense necessary for the start of the Work shall also be included. This <br /> Work also consists of the general project management of the Work <br /> including, but not limited to, field supervision and office management, as <br /> well as other incidental cost for management of the Work during the <br /> duration of the Contract. This lump sum price shall not exceed 5% of the <br /> total of all bid items. <br /> b. When 5% of the original Contract amount is earned from other bid items, <br /> 50% of the amount bid for Mobilization and Demobilization, or 5% of the <br /> original Contract amount, whichever is lesser, will be paid. <br /> c. Upon completion of work for the project, payment of the remaining amount <br /> bid for Mobilization and Demobilization will be paid. <br /> 1 2. Item #2 — DRY TONS (Unit Price) <br /> I <br /> 01 2213 - 1 UNIT PRICE MEASUREMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.