City of Everett 01 2213 - 1 <br /> 2019 Biosolids Removal UT3705-2 <br /> SECTION 01 2213 — MEASUREMENT AND PAYMENT <br /> PART 1 - GENERAL <br /> A. SUMMARY <br /> 1. Unit price bid items measured in tons must be weighed and tested for solids <br /> content, and that information submitted to the Project Manager, prior to or <br /> concurrent with any application for payment. The minimum allowable solids <br /> content of any material loaded into a truck for weighing and transportation to the <br /> designated area on the Biosolids Pad shall be 28% Total Solids (TS). <br /> 1 B. REFERENCES <br /> 1. Section 00 7200 — GENERAL CONDITIONS 1.1 DEFINITIONS OF WORDS <br /> AND TERMS: <br /> DRY WEIGHT <br /> DRY TON <br /> WET WEIGHT <br /> TOTAL SOLIDS <br /> 2. Section 01 4523 — MATERIAL SAMPLING <br /> C. BID ITEMS <br /> 1. Item #1- MOBILIZATION AND DEMOBILIZATION (Lump Sum) <br /> a. The lump sum price Mobilization and Demobilization shall be full <br /> compensation for the Work consisting of the preparatory Work and <br /> operations in mobilizing for beginning Work on the Contract, including, but <br /> ' not limited to, movement of those personnel, equipment, supplies and <br /> incidentals to the project site, preparation of submittals, and for the <br /> establishment of temporary offices, phone service, equipment and first aid <br /> supplies, field surveys, sanitation needs and all other facilities required by <br /> these specifications, and State and local laws and regulations. The costs of <br /> bonds, permits, and any required insurance, and any other preconstruction <br /> ' expense necessary for the start of the Work shall also be included. This <br /> Work also consists of the general project management of the Work <br /> including, but not limited to, field supervision and office management, as <br /> well as other incidental cost for management of the Work during the <br /> duration of the Contract. This lump sum price shall not exceed 5% of the <br /> total of all bid items. <br /> b. When 5% of the original Contract amount is earned from other bid items, <br /> 50% of the amount bid for Mobilization and Demobilization, or 5% of the <br /> original Contract amount, whichever is lesser, will be paid. <br /> c. Upon completion of work for the project, payment of the remaining amount <br /> bid for Mobilization and Demobilization will be paid. <br /> 1 2. Item #2 — DRY TONS (Unit Price) <br /> I <br /> 01 2213 - 1 UNIT PRICE MEASUREMENT <br />