My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3216 - 1 <br /> 2019 Biosolids Removal UT3705-2 <br /> SECTION 01 3216 - CONSTRUCTION PROGRESS SCHEDULE <br /> PART 1 - GENERAL <br /> 1.1 CONSTRUCTION SCHEDULE <br /> ' A. The Contractor shall prepare a construction schedule showing all tasks required to <br /> perform the work. Schedule shall show all tasks performed by all trades that is required <br /> to perform work within the contract time. The Schedule shall include sufficient time for <br /> ' cleaning, punch list review and completion of punch list items prior to the designated <br /> physical completion date. <br /> 1.2 FORMAT <br /> A. The Schedule shall be a critical path method Gantt chart style. <br /> ' B. The Schedule shall clearly identify all work and detailed to show specific steps to perform <br /> work. The relationship between the work items shall show the starting date, length of <br /> time required to perform work, completion of the work within the time frame shown. <br /> C. All work found on the schedule of values shall be clearly identified. Unless otherwise <br /> expressly authorized in writing by the City's representative, the Contractor must integrate <br /> the schedules with the Schedule of Values and unit price items so that each construction <br /> activity is represented by a dollar value. <br /> D. Submittals dates shall be included and the relationship between submittal and the work <br /> item shall be identified <br /> ' E. Materials requiring long lead times shall be clearly identified on the schedule. This shall <br /> include: <br /> 1. Date materials musts be ordered <br /> ' 2. Time for manufacturing <br /> 3. Time for delivery <br /> 4. Delivery date (expected date materials to be at the project) <br /> 5. Date of Installation <br /> 1.3 SUBMITTAL <br /> ' A. At the pre-construction meeting, a preliminaryschedule is required to be submitted. <br /> 9 <br /> Once the preliminary schedule has been approved, the schedule shall become the <br /> Project Schedule. The Project Schedule, as approved by the City, will be an integral part <br /> of the contract and will establish interim completion dates for the various activities under <br /> the contract. <br /> B. Schedule shall be submitted electronically. Acceptable format .mpp and pdf. <br /> I <br /> 01 3216 - 1 CONSTRUCTION PROGRESS SCHEDULE <br />
The URL can be used to link to this page
Your browser does not support the video tag.