My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3300 - 1 <br /> 2019 Biosolids Removal UT3705-2 <br /> I <br /> SECTION 01 3300 - SUBMITTAL PROCEDURES <br /> PART 1 - GENERAL <br /> 1.1 DESCRIPTION <br /> ' A. To ensure that the specified products are furnished and installed in accordance with the <br /> design intent, procedures have been established for advance submittal of design data <br /> and for its review by the City. <br /> B. Electronic submittals of shop drawings or other documents required for approval may be <br /> substituted for paper copies. Electronic submittals must be submitted utilizing current <br /> ' portable document format (PDF) software. All electronic submittals shall be certified <br /> documents and digitally signed showing Contractors review, and stamp showing <br /> approval of submittal. All electronic submittals shall be book-marked. A table of contents <br /> is required and shall be placed directly behind the cover page. Document properties <br /> ' shall include the Job Name, Division (Section Number), and items included in submittal. <br /> Prior to use of Electronic submittals, discuss with City, procedures and formatting <br /> including any additional contents to be included within the document. <br /> C. Related Work: <br /> 1. For individual submittals required, refer to the pertinent sections of these <br /> specifications. <br /> 2. Section 00 7200-2.4 <br /> 3. Make all submittals required by the Contract Documents, revise and resubmit as <br /> ' required to establish compliance with the specified requirements. <br /> 4. Wherever possible throughout the Contract Documents, the minimum acceptable <br /> quality of workmanship and materials has been defined by manufacturer's <br /> description of required attributes and performance. <br /> 1 ') PRODUCT HANDLIM( <br /> A. Make all submittals1 of shopdrawings, samples, requests for substitution, and other <br /> ' 9 P q <br /> similar items in strict accordance with the provisions of this section of the specifications. <br /> PART 2 - PRODUCTS (NOT USED) <br /> PART 3 - EXECUTION <br /> 3.1 IDENTIFICATION OF SUBMITTALS <br /> A. Consecutively number all submittals. Accompany each submittal with a letter of <br /> transmittal showing the transmittal number, date of transmittal, specifications section or <br /> I <br /> 01 3300 - 1 SUBMITTAL PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.