My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 4500 - 4 <br /> 2019 Biosolids Removal UT3705-2 <br /> requested. Notify agency sufficiently in advance of operations to permit assignment of <br /> personnel. Provide the following: <br /> 1. Access to the Work. <br /> 2. Incidental labor and facilities necessary to facilitate tests and inspections. <br /> 3. Adequate quantities of representative samples of materials that require testing and <br /> inspecting. Assist agency in obtaining samples. <br /> 4. Facilities for storage and field-curing of test samples. <br /> 5. Delivery of samples to testing agencies. <br /> 6. Preliminary design mix proposed for use for material mixes that require control by <br /> testing agency. <br /> 7. Security and protection for samples and for testing and inspecting equipment at <br /> Project site. <br /> F. Coordination: Coordinate sequence of activities to accommodate required quality- <br /> assurance and quality-control services with a minimum of delay and to avoid necessity <br /> of removing and replacing construction to accommodate testing and inspecting. <br /> 1. Schedule times for tests, inspections, obtaining samples, and similar activities. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) ' <br /> END OF SECTION 01 4500 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 01 4500 - 4 QUALITY CONTROL <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.