My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 2113 - 2 1 <br /> 2019 Biosolids Removal UT3705-2 <br /> material made available relating to the Work, Bidder shall so notify the City in writing, <br /> and may apply to the City for additional information and explanation before submitting <br /> their Bid. I <br /> B. The submission of a Bid by the Bidder shall constitute acknowledgment that, in preparing <br /> and submitting a Bid, Bidder has not only reviewed the Contract Documents, but is also <br /> relying on their own knowledge, examination, inspection, and testing of: <br /> 1. the Site of the Work, <br /> 2. access to the Site, <br /> 3. environmental factors, <br /> 4. all other data, matters and things requisite to the fulfillment of the Work, <br /> 5. conditions ordinarily to be encountered and generally recognized as inherent in the <br /> Work, <br /> 6. available services and utilities at and in the vicinity of the Site of the Work, and <br /> 7. all applicable federal, state and local statutes, ordinances, and regulations dealing <br /> with building, public health and safety, or with the prevention of environmental <br /> 111 <br /> pollution and the preservation of public natural resources, and environmental <br /> assessments or impact statements which have been prepared relating to the Work. <br /> C. Bidder acknowledges that he/she has not relied on representation or warranty of the City <br /> not expressly included in the Contract Documents. <br /> D. The information provided by the City is not intended to be a substitute for, or a <br /> supplement to, the independent verification by the Bidder to the extent such independent <br /> investigation of the Drawings and Specifications or Site conditions is deemed necessary <br /> or desirable by the Bidder. Bidder acknowledges that they have not relied upon City or <br /> Project Manager furnished information regarding site conditions in preparing and <br /> submitting a Bid. <br /> I <br /> 1.5 INTERPRETATION OF CONTRACT DOCUMENTS <br /> A. Should a Bidder find what is believed to be discrepancies in or omissions from the <br /> Drawings or Specifications, or should the Bidder be in doubt as to their meaning, Bidder <br /> may submit to the City a written request for an interpretation thereof. The Bidder <br /> submitting the request will be responsible for its prompt delivery. Any interpretation of <br /> the documents, if made, will be made only by addendum duly issued. All requests for <br /> interpretations must be in writing and received by the City no later than 7 calendar days <br /> prior to the bid opening date. All questions regarding the Contract Documents shall be <br /> referred to the City at the address provided in the Contract Documents. <br /> 1.6 PREPARATION OF BIDS 111 <br /> A. Bids shall be submitted on the forms provided by the City and found in the Contract <br /> nor]iments All honk spares in the Bir{form shall he legibly filled ini ising a non-erasable 111 <br /> medium. In addition to writing in the bid amount in numbers, be sure to write out the bid <br /> amount in words in the space provided in the Bid form. Where conflict occurs, the written <br /> or typed words shall prevail. In the event that the product of a unit price and an estimated <br /> quantity does not equal the extended amount quoted, the unit price shall govern, and the <br /> correct product of the unit price and the estimated quantity shall be deemed to be the <br /> 00 2113 - 2 INSTRUCTIONS TO BIDDERS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.