My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 2113 - 4 <br /> 2019 Biosolids Removal UT3705-2 <br /> 1.9 BID SECURITY <br /> A. Bid Security in the amount of at least 5 percent of the Total Bid Amount shall accompany <br /> each Bid. This security may be by certified check, cashier's check, or a bid bond made <br /> payable to the City of Everett. A bid bond shall be on the form provided in the Contract <br /> Documents. A bid bond shall not be conditioned to modify the minimum 5-percent <br /> required. The surety shall: (1) be registered with the Washington State Insurance111 <br /> Commissioner, and (2) appear on the current Authorized Insurance List in the State of <br /> Washington published by the Office of the Insurance Commissioner. <br /> B. The failure to furnish a bid security of a minimum of 5 percent shall make the Bid <br /> nonresponsive and shall cause the Bid to be rejected by the City of Everett. <br /> C. Bid security shall serve as evidence of good faith and as a guarantee that if awarded the I <br /> Contract the Bidder will execute the Contract and provide bonds as required by the Bid. <br /> Should the successful Bidder fail to enter into the Contract, furnish a satisfactory <br /> performance and payment bond, and furnish evidence of insurance within 14 calendar <br /> days after the award date, the certified check, cashier's check or bid bond shall be <br /> forfeited as liquidated damages. <br /> 1.10 LIST OF SUBCONTRACTORS <br /> A. Bidder shall complete SECTION 004336 - SUBCONTRACTORS FORM and submit it 111 <br /> with the Bid. <br /> p <br /> 1.11 REJECTION OF ANY AND ALL BIDS <br /> A. The City reserves the right to reject any and all Bids. I <br /> 1.12 RETURN OF BID SECURITY I <br /> A. Within 15 calendar days after the Bids are opened, the City will return the bid security <br /> accompanying the Bids that are not to be considered in making the award. All other bid <br /> securities will be held until the Contract has been fully executed; after which they will be <br /> returned to the respective Bidders whose Bids they accompanied. <br /> I <br /> 1.13 AWARD OF CONTRACT <br /> A. Evaluation of Bids I <br /> 1. Bids will be evaluated by the City to determine which bid is the lowest responsive <br /> bid by a responsible bidder and which bid, if any, should be accepted in the best <br /> interest of the City. The City, in its sole discretion, reserves the right to accept or <br /> reject any and all bids submitted and to waive informalities and minor irregularities. <br /> a. LOWEST: The City will award the Project to the responsive and responsible <br /> bidder whose Bid is the lowest. In accordance with RCW 39.04.380, if a bid <br /> is received from a nonresident contractor from a state that provides an in- <br /> state percentage bidding preference and does not have an office located in <br /> 00 2113 - 4 INSTRUCTIONS TO BIDDERS <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.