Laserfiche WebLink
City of Everett 00 7200 - 25 <br /> 2019 Biosolids Removal UT3705-2 <br /> 1 8. MATERIAL,EQUIPMENT,WORKMANSHIP AND CONSTRUCTION UTILITIES <br /> ' 8.1. GENERAL <br /> Unless otherwise specifically stated in the Contract Documents,the Contractor shall provide and pay for <br /> materials, labor,tools, Equipment,water, light, power,transportation, supervision, and temporary <br /> construction of any nature,and other services and facilities of any nature,whatsoever necessary, to <br /> execute,complete and deliver the Work within the specified time. Contractor shall be liable for all power <br /> and water costs until Substantial Completion,whether such power or water is provided by temporary or <br /> permanent facilities. Owner shall not be liable for any costs or Delays arising out of or caused by the <br /> availability or lack of availability of permanent power or utilities. Material and Equipment shall be new <br /> and of the specified quality. Equipment offered shall be new or current specified models. This <br /> requirement does not apply to minor details, or to thoroughly demonstrated improvements in design or in <br /> materials of construction. Construction Work shall be executed in conformity with the standard practice <br /> of the trade. <br /> 111 8.2. PRODUCT DATA <br /> When specified,the Contractor shall provide data required for inspecting,testing,operating, or <br /> maintaining parts of the Work. Unless otherwise specified, such data shall be provided at the time the <br /> ' referenced material or Equipment is delivered to the job Site. The data shall be as specified and shall <br /> include, unless otherwise specified, such items as shop drawings, erection drawings, reinforcing steel <br /> schedules,testing and adjusting instructions, operations manuals,maintenance procedures, parts lists, and <br /> 1 record drawings. Such data shall be provided as part of the Work under this Contract and its acceptability <br /> determined by the Owner in its sole discretion. <br /> 8.3. QUALITY <br /> ' Where detailed Specifications of materials, Equipment, or construction Work are not set forth,the <br /> Contractor shall perform the Work using materials and Equipment of a quality comparable to the <br /> ' materials and workmanship specified for the other parts of the Work, from firms of established good <br /> reputations, and shall follow standard practices to perform construction Work of good quality in a <br /> workmanlike way. Work performed shall be in conformity and harmony with the intent to secure the <br /> standard of construction and Equipment of Work as a whole and in part. All Work must comply and <br /> conform to applicable building codes in effect when the Work is performed. <br /> 8.4. MATERIAL AND EQUIPMENT SPECIFIED BY NAME <br /> When material or Equipment is specified by reference to patents, brand names, or catalog numbers,the <br /> Owner will not usually consider or approve a substitution. However,the Contractor may offer <br /> substitutions of products it considers to be equal to that specified, but the Owner is not obliged or required <br /> to consider or accept such offered substitution. <br /> 8.5. REQUESTS FOR SUBSTITUTION <br /> The Contractor may offer material or Equipment of equal or better quality and performance in <br /> substitution for those specified. Only the Contractor may request substitutions. The Contractor's offers of <br /> substitution shall be made in writing to the Owner's Representative and shall include sufficient data to <br /> enable the Owner's Representative to assess the acceptability of the material or Equipment for the <br /> particular application and requirements. The Owner and Owner's Representative are not required or <br /> obligated to consider or review a request for substitution and may, in their sole discretion and option, <br /> consider or review such requests. <br /> 1 If the offered substitution requires changes to or coordination with other portions of the work,the <br /> Contractor shall include with its substitution request any such drawings and details showing such <br /> changes. The Contractor agrees to perform these changes as part of the substitution of material or <br /> Equipment at no additional cost to the Owner. Approval of a substitution request shall not relieve the <br /> 00 7200 - 25 GENERAL CONDITIONS <br />