My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 -24 ' <br /> 2019 Biosolids Removal UT3705-2 <br /> certification is received from the Department of Labor and Industries that the prevailing wage <br /> requirements of state law have been satisfied. <br /> Any fees charged by the Department of Labor and Industries for filing such statements or submitting such <br /> affidavits shall be the responsibility of the Contractor, and each Subcontractor; if, for any reason, the <br /> Owner pays such fees,then the Contractor shall be charged the amounts thereof. <br /> 7.3. HOURS OF LABOR I <br /> Contractor shall comply with all applicable laws and regulations regarding hours of work, including, but <br /> not limited to,RCW Chap.49.28. <br /> 7.4. CONTRACT WORK HOURS <br /> The Contractor shall comply with Section 103 of the Contract Work Hours and Safety Standards Act(40 <br /> U.S.C. section 327-330)as supplemented by Department of Labor Regulations(29 CFR, Part 5). Under <br /> this section the Contractor shall compute the wages of every mechanic and laborer on the basis of a <br /> standard work week of forty(40)hours. Work in excess,of the standard work week is permissible, <br /> provided the worker is compensated as required by law. <br /> 7.5. OVERTIME WORK <br /> Overtime and shift work may be established as a regular procedure by the Contractor with reasonable 1 <br /> Notice to and written permission of the Owner's Representative. Permission may be denied for such <br /> reasons as noise,traffic, or other interference with the neighborhood in which the Project is located, or the <br /> lack of availability of inspectors during overtime or shift work. I <br /> 7.6 LABOR RELATIONS <br /> The Contractor shall take all reasonable steps to prevent any labor Disputes involving the Contractor and <br /> any of its Subcontractors or Suppliers of any products or services from disrupting the Work under this <br /> Contract or interfering with access to the Owner's property by the Owner, including its agents, <br /> representatives, employees and officials,any other contractors engaged in construction activities, or <br /> members of the public. In the event any picketing or other concerted activity by employees involved in a <br /> labor Dispute with the Contractor or its Subcontractors or Suppliers interferes in any way with access to <br /> the Owner's property by any persons,the Contractor shall promptly and expeditiously take all reasonable <br /> actions to eliminate or minimize such interference, including but not limited to: (1)utilizing all <br /> reasonable means of restricting any picketing to a single entrance to the Owner's property; (2)posting <br /> notices or signs which advise interested persons and labor organizations that a particular entrance to the <br /> Owner's property is for the employees of"primary" or, as the case may be, "neutral" employers; (3) <br /> policing entrances to ensure that only authorized personnel may use those entrances; (4)notifying all <br /> interested labor organizations of the "primary" or"neutral" status of particular entrances; and(5) in the <br /> event any such picketing or concerted activity is unlawful or has a secondary impact upon the employees <br /> of neutral employers, promptly and expeditiously taking appropriate action to seek recourse through the <br /> appropriate governmental agency or state or federal courts to limit the location of such picketing so as to <br /> reduce the impact thereof upon neutral employers. <br /> The Owner will cooperate with the Contractor to accomplish the foregoing actions and will render <br /> assistance as may be in the best interests of the Owner. However,the Owner shall have the right to direct <br /> the Contractor to modify any of the foregoing actions the Contractor has taken or plans to take or to <br /> overrule such actions,to designate the entrances to be used as "primary" or"neutral" entrances, and to <br /> take appropriate legal action in order to protect the Owner's property and interests. In any event, the <br /> Contractor shall be liable for all Delays and costs, including costs to the Owner,and actual damages <br /> resulting from the relocation,rerouting, Delays or actions required to maintain the uninterrupted progress <br /> of the Work. Failure by the Contractor to take the actions described above or to comply with the <br /> directives of the Owner shall be considered a breach of this Contract and the Owner may terminate the <br /> Contract or suspend the Contractor as provided in this Contract. <br /> 00 7200 - 24 GENERAL CONDITIONS , <br />
The URL can be used to link to this page
Your browser does not support the video tag.