My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Port of Everett 6/19/2019
>
Contracts
>
6 Years Then Destroy
>
2019
>
Port of Everett 6/19/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:50:52 AM
Creation date
7/11/2019 9:50:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Port of Everett
Approval Date
6/19/2019
End Date
9/10/2019
Department
Administration
Department Project Manager
Carol Thomas
Subject / Project Title
Cooperative Use of Facilities Equipment
Tracking Number
0001874
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Use of Property
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rescheduling <br /> If an approved special event or use needs to be rescheduled, a written request must be <br /> provided to the Port no less than sixty (60) calendar days prior to the confirmed reservation <br /> date to qualify for a full transfer of any paid fees to the rescheduled date. To qualify for a fifty <br /> (50) percent transfer of any paid fees, a written request must be provided to the Port a <br /> minimum of thirty (30) calendar days prior to the confirmed reservation date. If less than thirty <br /> (30) calendar days notice is given, the Permittee may forfeit their previously submitted fees, at <br /> the Port's discretion. Rescheduling of a Port public space will be based on availability, and if <br /> approved, written confirmation will be provided. For any reservation rescheduling, a$25 non- <br /> refundable processing fee will be assessed, and the balance of any remaining fees will be due <br /> upon approval of the new reservation date. <br /> Cancellations and.Refunds <br /> All Special U3e Permit cancellations d requests-for refunds must be madeirtnvicitiiitTo the <br /> Port oEverett, Attn: Special'Use PetftiitS a't"1205 Crettillan Wim;StYi`ti"'' OfrE Fe A <br /> 98201 or PO Box 538, Everett, WA 98206. Once received, refunds generaewitl`be'issued <br /> within fourteen (14) business days. To receive a full refund of fees, cancellation notification <br /> must be made in writing a minimum of sixty (60) calendar days prior to the confirmed <br /> reservation date. A fifty (50) percent refund will be provided if cancellation notification is made <br /> in writing a minimum of thirty (30) calendar days prior to the confirmed reservation date. All <br /> fees shall be forfeited with less than thirty(30) calendar days notice of cancellation, and no <br /> refunds will be made due to weather conditions. Should the Port be required to cancel a <br /> reservation due to an emergency or other Port requirement, a full refund will be made. The $25 <br /> application processing fee is non-refundable. <br /> If a security deposit was collected, upon the return of the public meeting space to a neat, clean <br /> and undamaged condition, the Premittee will receive a refund of their security deposit within <br /> fourteen (14) business days. If the public space is not returned to pre-event condition, the Port <br /> will clean and/or repair any damage and deduct labor, material and administrative costs from <br /> the security deposit. Any remaining security deposit funds will be refunded to the Permittee <br /> within fourteen (14) business days after completion of any clean up and/or repair work. If <br /> clean up or damage exceeds the amount of the security deposit, the Permittee will be required <br /> to pay any additional costs within 15 days of receiving an invoice. <br /> Appeals <br /> If an applicant is dissatisfied with the decision by Port officials on a Special Use Permit <br /> Application, the applicant may appeal to the Port of Everett's Executive Director, P.O. Box 538, <br /> Everett, Washington 98206 or by phone at (425) 259-3164. The appeal should contain the <br /> following information: 1) a precise identification of the application, 2) a statement of the action <br /> or omission causing concern, 3) the action requested by the applicant and the reasons <br /> supporting it (i.e. why the action is unfair or a hardship; impacts of the decision of Port <br /> personnel that the Executive Director might not otherwise know, etc.), 4) whether an <br /> opportunity to speak with the Executive Director or a hearing is requested, and if so, an <br /> address, phone and/or e-mail where the applicant may be contacted, 5) if a decision is urgently <br /> needed, an indication when a decision needs to be made. Appeals will be considered within a <br /> reasonable time-within forty-eight (48) hours if the appeal raises issues of constitutional <br /> rights and requires immediate attention. If practical, the matter may be resolved by telephone <br /> or scheduled meeting. <br /> Public Use Standards <br /> Conduct <br /> All persons shall conduct themselves in a civil manner consistent with community standards <br /> and Port policies. Individuals or groups being disruptive or causing damage will be directed to <br /> leave and/or denied subsequent use of Port facilities in the Port's discretion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.