My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Port of Everett 6/19/2019
>
Contracts
>
6 Years Then Destroy
>
2019
>
Port of Everett 6/19/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:50:52 AM
Creation date
7/11/2019 9:50:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Port of Everett
Approval Date
6/19/2019
End Date
9/10/2019
Department
Administration
Department Project Manager
Carol Thomas
Subject / Project Title
Cooperative Use of Facilities Equipment
Tracking Number
0001874
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Use of Property
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Use Permits allow the Port to schedule events in an effort to prevent conflicts, <br /> coordinate any necessary site preparations, provide personnel or facilities support (if <br /> necessary), and to avoid overuse or undesired impacts on public spaces. Reserving use of Port <br /> properties shall be on a first-come, first-serve basis. Applications will be accepted up to twelve <br /> (12) months in advance. Submittal of an application does not guarantee availability or a <br /> reservation. <br /> To apply for a Special Use Permit: <br /> 1. Complete a Special Use Permit Application(Attachment 1) <br /> — Applications must be submitted a minimum of sixty (60) calendar days prior to <br /> desired reservation date; for applications submitted less than 60 calendar days <br /> prior, at the Port's discretion, consideration of the Special Use Permit can be <br /> denied <br /> — An incomplete and/or unsigned application will be returned for completion <br /> before consideration <br /> — Answer all questions; answers should provide a full description of the activities <br /> planned <br /> — Additional pages or information may be attached if necessary <br /> 2. Submit the application and $25 non-refundable application processing fee to the Port of <br /> Everett in one of the following ways: <br /> — Deliver to the Port of Everett Administration Office located at 1205 Craftsman <br /> Way, Suite 200, Everett, WA 98201 <br /> — Mail to Port of Everett, Attn: Special Use Permits, P.O. Box 538, Everett, WA <br /> 98206 <br /> — E-mail to specialusepermits(a)portofeverett.com, followed by a phone payment of <br /> the application processing fee to 425.259.3164 or delivery of payment to the Port <br /> of Everett Administration Office or P.O. Box (processing will not begin until both <br /> the application and payment have been received by the Port) <br /> NOTE:Approval of the application is not guaranteed by virtue of payment of the non-refundable application <br /> processing fee. <br /> 3. Upon submittal, the Port will determine if your event is low-impact or high-impact. If <br /> the event is determined to be high-impact, you may be directed to submit additional <br /> information or documentation to complete the application process. <br /> 4. Upon completion of Steps 1 - 3, the Port will initiate an internal application review <br /> process, which may take up to 30 calendar days to complete. If additional time is <br /> needed, the Port will inform the applicant in writing. <br /> 5. If the application is approved and/or approved with conditions, a letter of approval and <br /> an approved copy of the Special Use Permit Application will be provided to the applicant <br /> via e-mail, and shall serve as confirmation and proof of reservation. If the Port denies <br /> the application, notification will be provided by e-mail. <br /> 6. If approved, submittal of all fees (plus any applicable sales tax), all required <br /> documentation (insurance, permits, day of event form, etc.) and proof of completion of <br /> any special requirements are due to the Port no later than 60 calendar days prior to the <br /> special event or use. Failure to do so will result in cancelation of the reservation. <br /> NOTE:If a Special Use Permit is approved less than sixty(60)calendar days prior to use,all payments, <br /> documentation and other requirements are due to the Port within three(3)business days. Upon approval by <br /> the Port, any "government and/or public entity"unable to submit payment prior to use may be allowed to <br /> provide a purchase order to the Port. The Port will invoice the Permittee for all applicable fees and any <br /> associated damage, cleaning and/or other costs following the event. The Port's rescheduling, cancellation <br /> and refund policy provided herein will apply, and will be invoiced accordingly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.