My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Department of Ecology 5/5/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
Washington State Department of Ecology 5/5/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2021 9:55:21 AM
Creation date
7/11/2019 10:09:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Department of Ecology
Approval Date
5/5/2019
Council Approval Date
4/24/2019
End Date
12/31/2021
Department
Public Works
Department Project Manager
Grant Moen
Subject / Project Title
Port Gardner Bay Outfalls WQ Retrofit
Public Works WO Number
UT3701
Tracking Number
0001877
Total Compensation
$882,773.00
Contract Type
Agreement
Contract Subtype
Grant
Retention Period
6 Years Then Destroy
Document Relationships
WA ST Dept of Ecology 11/2/2021 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State orWashington Department of Ecology Page 11 of 38 <br /> Agreement No: WQC-2019-EverPW-00052 <br /> Project Title: Port Gardner Bay Outfalls Water Quality Treatment Retrofit <br /> Recipient Name: City of Everett Public Works Department <br /> SCOPE OF WORK <br /> Task Number: 3 Task Cost: $24,500.00 <br /> Task Title: Construction Management <br /> Task Description: <br /> A. The RECIPIENT will provide construction oversight and management of the project. <br /> B. The RECIPIENT will submit a detailed construction quality assurance plan to ECOLOGY for review and <br /> acceptance before the start of construction. This plan must describe how the RECIPIENT will perform adequate and <br /> competent construction oversight. Once accepted by Ecology,upload to EAGL. <br /> C. The RECIPIENT will conduct a pre-construction conference meeting and invite ECOLOGY to attend. <br /> D. The RECIPIENT will submit an updated project schedule with projected cash flow to ECOLOGY within 30 days <br /> of the start of construction.The RECIPIENT will revise and/or update the project schedule whenever major changes <br /> occur and at a minimum of every three months. The RECIPIENT will submit the updated schedule to ECOLOGY with <br /> the quarterly report.When changes in the construction schedule affect previous cash flow estimates,The RECIPIENT <br /> must submit revised cash flow projections to ECOLOGY. <br /> E. Prior to execution,the RECIPIENT will submit in writing any eligible change orders that are a significant deviation <br /> from ECOLOGY-accepted plans and specifications for ECOLOGY review and acceptance for payment.ECOLOGY <br /> must review and accept all change orders that impact grant eligible activities prior to implementation. ECOLOGY <br /> must review all other change orders for technical merit and should be submitted within 30 days after execution. <br /> Change orders are to be signed by the contractor,the engineer(if appropriate),and the RECIPIENT prior to submittal <br /> to ECOLOGY for acceptance. <br /> F. The RECIPIENT will operate and maintain the constructed facility for the design life of the facility.Additionally, <br /> the RECIPIENT will develop and submit an operations and maintenance(O&M)plan for all Water Quality Best <br /> Management Practices to ECOLOGY for review. The O&M plan will describe how the RECIPIENT will ensure <br /> project success consistent with the design manual used.The O&M plan must also address long-term activities to assure <br /> ongoing pollutant removal and flow-control capability of the project in accordance with the design manual. <br /> G. Upon completion of construction,the RECIPIENT will provide to ECOLOGY: <br /> 1. A Stormwater Construction Completion Form signed by a professional engineer indicating that the project was <br /> completed in accordance with the plans and specifications and major change orders approved by ECOLOGY's Project <br /> Engineer and shown on the Record Drawings.The Stormwater Construction Completion Form can be found on the <br /> ECOLOGY website. <br /> 2. GIS compatible project area in Shapefile,Geodatabase file,or ECOLOGY-Approved Equivalent. The project area <br /> should include features for treatment facilities and contributing areas. <br /> Task Goal Statement: <br /> The RECIPIENT will oversee and manage construction,communicate with ECOLOGY in a timely fashion,and <br /> provide ECOLOGY with all requested project documentation. <br /> Version 10/30/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.