Laserfiche WebLink
• State oar Washington Department of Ecology Page 13 of 38 <br /> Agreement No: WQC-2019-EverPW-00052 <br /> Project Title: Port Gardner Bay Outfalls Water Quality Treatment Retrofit <br /> Recipient Name: City of Everett Public Works Department <br /> SCOPE OF WORK <br /> Task Number: 4 Task Cost: $1,092,530.67 <br /> Task Title: Construction <br /> Task Description: <br /> A. The RECIPIENT will,in accordance with ECOLOGY-accepted plans and specifications,complete construction of <br /> the project. The construction project will include installation of MWS-Linear Modular Wetland Stormwater <br /> Treatment Systems to mitigate runoff from approximately 20 acres of primarily pollution generating impervious <br /> surfaces. <br /> B. Calculate and submit an equivalent new/re-development area for the completed retrofit project(s)using the methods <br /> outlined in the Combined Water Quality Financial Assistance Program Funding Guidelines or other <br /> ECOLOGY-accepted method. <br /> Task Goal Statement: <br /> Construction of the project in accordance with ECOLOGY-accepted plans and specifications. <br /> Task Expected Outcome: <br /> Constructed project will provide water quality benefits including reductions in total suspended solids(TSS), <br /> hydrocarbons,heavy metals,dissolved copper and zinc,and total phosphorus. <br /> Recipient Task Coordinator: Grant Moen <br /> Construction <br /> Deliverables <br /> Number Description Due Date <br /> 4.1 Copy of the contract documents(e.g.bid announcement,bid award and <br /> bid tabulations).Upload to EAGL and notify Ecology when upload is <br /> complete. <br /> 4.2 Copy of signed and dated construction contract.Upload to EAGL and <br /> notify Ecology when upload is complete. <br /> 4.3 Construction progress reports and photos included in progress reports <br /> uploaded to EAGL. <br /> 4.4 Completed equivalent new/redevelopment area determination.Upload to <br /> EAGL and notify Ecology when upload is complete. <br /> Version 10/30/2015 <br />