SPLIT DX HEAT PUMP SCHEDULE_ ;
<br /> SIZE RA INLET SUPPLY OUTLET FAN AMP 0 COMPR AMP MOTOR CDOUNG CAPACITY' HEATING CAPACITY}' REFRIGERANT/PIPES BASIS OF DESIGN
<br /> MARK BOEING EQUIPMENT NO. LOCATION TYPE (IN x IN X SIZE SIZE CFM ESP(IN WG) DRNE TYPE sEER 23(N 0 230V MCA MOP NAGE/PH WEIGHT - NOTES GENERAL NOTES
<br /> IN) (IN x IN.) (IN x IN.) EAT(DB/WB) TOT BN/HR EAT(OB/WB) TOT BN/HR TYPE UD SIZE VAP SIZE MANUFACTURER MODEL
<br /> HP-1A INDOOR CEUNG MOUNT 56%29X10 27 X 9 28 X 9 1100 0.4 DIRECT 13.8 2.8 3.5 208/1 80F/67F 42000 70F/60F 45000 R-4T0A 3/8' 5/8" 95 MITSUBISHI PEAR AD A42M 1)
<br /> HP-19 OUTSIDE WA)..MOUNT 38%14X38 -- -- 3530 0.1 DIRECT -- 0.75 20 26 40 208/1 95/75 -- 47 -- R-410A 3/8' 5/8' 260 MITSUBISHI PUZ A42 NHA3(-85) 1) 1. BUILDING PROCESS EQUIPMENT SCHEDULES ARE PROVIDED ON
<br /> SHEET 1,1340,
<br /> / HEATING CAPACITY BASED ON 17F D8 156'WB
<br /> • COOLING CAPACITY BASED ON 9508/75W8 AMBIENT CONDITIONS /'+
<br /> I)RECESSED MOUNT INDOOR UNIT WITH REFRIGERANT AND CONDENSATE PIPING PER MFR.RECOMMENDATION.PROVIDE WITH MFR.24/7 CONIROL/TSTAT,LOW AMBIENT CONTROLS,DEFROST CYCLE,LOW/HIGH HEAD PRESSURE CONTROL AUX NR ECONOMIZER TO ENGAGE AS FIRST STAGE OF COOLING. CONSTRUCTION NOTES:
<br /> 2)PROVIDE ALUMINUM BRACKET/SS NUTS&BOLTS AND MOUNT OUTDOOR UNIT AT BET ABOVE GRADE WITH WALL BRACKET TO ALLOW BIN CLEAR AIR FLOW INTAKE CLEARANCE BETWEEN WALL AND UNIT AND MFR.REQUIRED CLEARANCES ON ALL SIDES. FOfEO IENI 5111.E TO MATCH.
<br /> HEAT RECOVERY UNIT SCHEDULE EZ> REBALANCE EXISTING HVAC SYSTEM TO ACCOUNT
<br /> SUPPLY FAN RETURN/EXHAUST FAN GAS FURNACE HEAT EXCHANGER PERFORMANCE(WINTER) SINGLE BASIS OF DESIGN FOR ADDITIONAL IXFNUSf FAN ADDED.
<br /> BOEING POINT WEIGHT
<br /> MARK LOCATION TYPE MCA MOP NOTES NEW FUME EXHAUST FAN AND STACK ADDED TO
<br /> EQUIPMENT NO ESP(IN DRIVE
<br /> FAN ESP(IN DRIVE FAN MBH EFF'h/ INLET GAS OSA EAT OSA LAT TOT MBH RA EAT RA VOLTAGE/ (LB) A SYSTEM
<br /> CFM FAN HP CFM FAN HP MATERIAL MANUFACTURER MODEL //1
<br /> WG) TYPE RPM WG) TYPE RPM INPUT SEER TEMP PRESS (DB/WB) (DBNVB) INPUT (DBMS) (DBNVB) pH
<br /> HVAC-1 EQ PLTFRM SEMI-CUSTOM •'11 1.5 BELT 10 1824 1 BELT 10 1581 800 80 50 7"WC 17 46.1 800 70 44 304 SS 460/3 33 40 12000 INNOVENT ERU 1.2.3 A ® CHANGED THE WORD'MEZZANINE'TO
<br /> © C� 0
<br /> - 0 "EQUIPMENT PLATFORM',NO CONSTRUCTION
<br /> C
<br /> NOTES: FIXED SHEET NUMBER.NO CONSTRUCTION
<br /> 1)PROVIDE DOUBLE WALL GALVANIZED STEEL CONSTRUCTION,OUTSIDE AIR,EXHAUST AIR SHUTOFF DAMPERS,RECIRC DAM PERDAMPER ACTUATORS,MERV 8 PREFILTER AND MERV 14 CARBON FILTERS ON EXHAUST,MERV 8 PREFILTERS AND MERV 13 FILTERS ON SUPPLY,6"HIGH STEEL BASE FRAME W/LIFTING EYES. ACTMTY
<br /> 2)SS DRIP PAN BELOW HEAT EXCHANGER AND BELOW FURNACE.SS FURNACE HEAT EXCHANGER,FULLY MODULATING FURNACE CONTROLS WITH CONCENTRIC 2-6"OSA INTAKE/6"GAS VENT KITS.UNIT MOUNTS.'•IS 0 NECT`FOR SF AND EF,INTERNAL FAN SPRING ISOLATION CONNECTION/DISCONNECT,SEPARATE 120 V DISCONNECT,CIRCUIT AND UGHT
<br /> SWITCHES IN FAN COMPARTMENTS,MFR PROVIDED ELECTRONIC DEFROST DAMPERS/CONTROLS.
<br /> 3) PROVIDE INTERNAL FAN SPRING ISOLATION.TEFC PREMIUM EFFICIENCY FAN MOTORS,SINGLE POINT 480 V ELECTRICAL CONNECTION/DISCONNECT,SEPARATE 120 V DISCONNECT,CIRCUIT AND LIGHT SWITCHES IN FAN COMPARTMENTS.
<br /> I'WI.-IV--MI--I•••
<br /> 4) REBALANCE SUPPLY AND RETURN FLOW RATES
<br /> 0
<br /> 2 FANS PLUMBING FIXTURE SCHEDULE
<br /> BOEING INLET OVERALL MOTOR MOTOR BASIS OF DESIGN
<br /> AREA TSP(IN FAN BHP MAX MOTOR
<br /> MARK EQUIPMENT SERVED /LOCATION PE SIZE 512E CFM WG) DRIVE TYPE FAN RPM (WATTS) SONES RPM HP VOLTAGE/ WEIGHT NOTES
<br /> NO. (IN x IN.) (IN x IN.) (WATTS) PH MANUFACTURER MODEL MARK FIXTURE DESCRIPTION ACCESSORIES DESCRIPTION NOTES
<br /> VENT CW HW PW AIR ADA INST
<br /> EQUIPMENT 150 Q O IW CONN
<br /> F-1 __-_MMS PLATFO-M CAIN T 1 4. 4.0 0.•5 IIR.0 1 td W•TT 14_• 551,,,,,,„,..,„„„,...„,„29.,.... H• •- 1
<br /> EF-1 'v v� C ROOF HIGH PLUME 13"DIA 40036,127 2000 1.50 DUAL BELT 2461 1 3 - 1725 2 460/3 400 GREENHECK Vtl.l VK-W 2 3 p-1 SINGLE SINK-SS SELF RIMMING MIXING FAUCET 1-1/2 - 1/2 112 YES
<br /> :A -12-10-II-MV ©
<br /> P-2 EMERGENCY SHOWER/EYEWASH W/1"%1'X1'THERMO MIXING - -
<br /> 1 1 YES 1
<br /> P-3 SINGLE SS COUNTER/SINK DUAL FAUCETS/VB 1-1/2 - 1/2 1/2 1/2 NO 3
<br /> NOTES:
<br /> P-4 LOW VOLUME DUPLEX AIR OUTLET BOEING STANDARD QUICK CONN 2(1/2') NO 4
<br /> P:O • .,FT 4•0: •U. •R.G •-T•(, , - 8 D • T -:• _ •-• •• : _ - 0 O.T-•L: • I •L •G T. -,.0 • - - - L
<br /> ©
<br /> 2)COMPLET WI H MILL DUTY EEC N •PREMIUM EF ICI N MOTO••ENT!"E UNIT COAT D WIT "LABCOA OR APPRO D QUAL,316 SS HAFT.SPRIN ISOLA 0-,AIRFLOW MONITORING STATION"SU- -Al•E"OR EQ AL.WIND BAND AND SELF 5 PPOR ED P-5 HIGH VOLUME DUPLEX AIR OUTLET BOEING STANDARD QUICK CONN 2(3/4") NO 2
<br /> STACK TO DISCHARGE A MINIMUM OF 10-0'ABOVE ROOF WITHOUT GUY WIRES,L(1)LIFE OF 80,000 HOURS BEARINGS,WEATHERHOOD FOR MOTOR. p-6 PRESSURE WASHER(RELOCATED) WALL EXTENSION TO WARM SIDE - - - 1 NO
<br /> 3)CONTRACTOR i FIELD SUPPLY ROOF EQUIPMENT RAILS,ELECTRICAL DISCONNECT BY DIV 26.
<br /> 0
<br /> DIFFUSER/GRILLE SCHEDULE HB-1 DOMESTIC WATER HOSE BIBB- FREEZE PROOF EXTENSION - - 3/4" - NO
<br /> HB-2 PROCESS WATER HOSE BIBB- FREEZE PROOF EXTENSION - - - 1-1/4' NO
<br /> TYPE CAPACITY BASIS OF DESIGN HB-3 PROCESS WATER HOSE BIBB- INDOOR HOSE VALVE - - - 3/4" NO
<br /> MARK NOM FACE FINISH/ BORDER NECK SIZE DUCT MAX FLOW MAX SP(IN MAX NECK NOTES
<br /> MAX NC(2) MANUFACTURER MODEL 1.ADA COMPLIANT.PROVIDE WITH MFR SELECTED TEMPERING VALVE TO SERVE EYEWASH AND SHOWER.
<br /> DESCRIPTION MATERIAL SIZE(IN) COLOR TYPE (IN) CONN(IN) (CFM) WG) VEL(IN)
<br /> CD1 CEILING DIFFUSER STEEL 24 X 24 WHITE [1] 10 10 550 0.1 900 29 TITUS MCD 2.PROVIDE DIXON MODEL SCVM-8 FLOW SENSOR VALVE AND DYNACON 001355973 HOSE COUPLER ON EACH OUTLET
<br /> SR-1 SUPPLY REGISTER ALUM WHITE FRAME H 0.1 550 30 TITUS 300FL
<br /> 3.SINK AND INTEGRAL SS COUNTER WITH SS LEGS AND 12"1-4101-1 BACKSPLASH
<br /> RG-1 RETURN GRILLE ALUM WHITE FRAME • U • 0.1 500 20 TITUS 50FF 4.PROVIDE DIXON MODEL SCVM-8 FLOW SENSOR VALVE AND DYNACON 001355973 HOSE COUPLER ON EACH OUTLET
<br /> RG-2 RETURN GRILLE ALUM • WHITE FRAME • 0 ' 0.1 5W 22 TITUS 350ZFL DAMPER SCHEDULE
<br /> EG-1 EXHAUST GRILLE ALUM • WHITE FRAME • it • 0.1 500 22 TITUS 350ZFL
<br /> NOTES: OVERALL SP BASIS OF DESIGN
<br /> MARK•' CITY SERVES LOCATED DAMPER BLADES SIZE DEPTH NUMBER OF MAX VELFACE DROP DAMPER DAMPER PROVIDE NOTES
<br /> AS SHOWN ON DRAWINGS (IN X IN.) (IN) SECTIONS CFM (FPM) WG) MATERIAL TYPE FIRESTAT MANUFACTURER MODEL
<br /> •W SAME SIZE AS GRILLE. 0.1 1 HP-1 RELIEF OFFICE/CONTROL RM PARALLEL BLADE 36,12 4 1 1100 387 0.1 GALV STEEL SMOKE/FIRE YES 1
<br /> 0-2 1 SF-I MAKEUP MCC RM PARALLEL BLADE 24,18 4 1 350 117 0.1 GALV STEEL SMOKE/FIRE YES 1
<br /> D3 1 SF-1 RELEIF MCC RM PARALLEL BLADE 2006 4 1 350 160 0.1 GALV STEEL SMOKEiFIRE YES 1
<br /> 1.PROVIDE DIFFUSERS WITH BORDER STYLES THAT ARE COMPATIBLE WITH ADJACENT CEILING SYSTEM.REFER TO ARCHITECTURAL PLANS.
<br /> HP-1
<br /> D.4 1 ECONOMIZER OFFICE CEILING PARALLEL BLADE 36X10 4 1 1100 367 0.1 GALV STEEL CONTROL NO 1
<br /> 2 NC BASED ON OCTAVE BANDS 2-7 SOUND POWER LEVELS MINUS A ROOM ABSORPTION OF 10 DB,MEASURED PER ASHRAE 70-91. HP-1
<br /> 05 1 ECONOMIZER OFFICE CEILING PARALLEL BLADE 36010 4 1 1100 367 0.1 GALV STEEL CONTROL NO 1
<br /> WATER HEATER SCHEDULE 56 I HP-1 RELIEF 4 OFFICE CEILING PARALLEL BLADE 3E02 4 1 11W 367 0.1 GALV STEEL BACKDRAFT NO •
<br /> RECOVERY WIDTH/ GAS GAS ELECTRICAL BASIS OF DESIGN
<br /> BOEING STORAGE CAPACITIES(GPH)AT HEIGHT D-7 1 SF-1 SUPPLY EQUIPMENT PLATFO- PARALLEL BLADE 20X20 4 1 1100 126 0.1 GALV STEEL BACKORAFT NO •
<br /> MARK SERVICE TYPE DIAMETER INPUT OUTPUT WEIGHT NOTES
<br /> EQUIPMENT NO. (GAL) 100 DEG"F TEMP (INCH) (INCH) TOTAL AMP V/PH/(60HZ) MFR MODEL
<br /> RISE MBH MBH NO. 0
<br /> WH-1 DOMESTIC HW TANK ' 50 80 22 71 76 69 3 120/1 A.O.SMITH BTX-80 825 III NOTES: 'LIST MFR SELECTION IN AS-BUILT DOCUMENTS.
<br /> 1)PROVIDE U.L.LISTED SMOKE/FIRE DAMPER WITH 120V/1 PH ELECTRIC ACTUATOR(OUTSIDE AIR STREAM)FOR EACH DAMPER SECTION FURNISHED BY MFR.
<br /> NOTES:
<br /> 1.PROVIDE MFR RECOMMENDED CONCENTRIC VENT KIT,FLUE DRAIN/TRAP,AMTROL XTROL ST-12 EXPANSION TANK ON CW INLET,5S DRIP PAN AND SEISMIC STRAP TO WALL. ELECTRIC HEATER SCHEDULE
<br /> PUMP SCHEDULE MARK LOCATION TYPE MOUNTING DEPTH ELECTRICAL BASIS OF DESIGN
<br /> BOEING HEIGHT
<br /> NOTES
<br /> EQUIPMENT NO. (INCH) (INCH)
<br /> TOTAL KW V/PH/(60HZ) MANUFACTURER MODEL NO.
<br /> B ELECTRICAL BASIS OF DESIGN
<br /> BOEING UH-1 MAIN ENTRY UNIT WALUCLG 1417.5 16 5 460/3 OMARK MUH 111
<br /> MARK EQUIP N•Q OCATION TYPE MOUNTING GPM HEAD(FT) TOTAL NOTES
<br /> WATTS V/PW(60HZ) MANUFACTURER MODEL NO. UH-2 FIRE SPRINKLER UNIT WALUCLG 14/7.5 16 5 460/3 OMARK MUH IT]
<br /> EQUIP N BELLE UH-3 FIRE SPRINKLER UNIT WALUCLG 14/7.5 16 5 460/3 QMARK MUH 0]
<br /> CP-1 PLATFORM IN LINE HUNG 5 10 120 120/1 GOSSETT NBF 185 III NOTES:
<br /> 1 1.PROVIDE WITH INTEGRAL THERMOSTAT,WALL BRACKET.OVERLOAD PROTECTION,INTERNAL RELAY&DISCONNECT.
<br /> NOTES:
<br /> 1.PROVIDE ALL BRONZE CONSTRUCTION FOR DOMESTIC WATER WITH TSTAT,24 HR TIMER,OVERLOAD PROTECTION&RELAY.
<br /> 100% DESIGN - ISSUED FOR CONSTRUCTION ® Stantec
<br /> 51'M PEVSDN BY ��� �T STAT � �, APPROVED �� DRAWN SATE SUBOTLE CURRENT REVISION SYMBOL DATE
<br /> A WWTP-ISSUED FOR CONSTRUCTION-RECORD 10011818 URS HAMILTON 11,14,12 • e, ACCEPTABILITY CHEERED
<br /> 3.20.18
<br /> TSI DESIGN I ANP/OR SRCKED MECHANICAL EQUIPMENT SCHEDULE „1,24.18
<br /> + SPECIFICATION IS APPROVED WEANEER 3.20,18 SHEET 1
<br /> B MOP-MODIFICATIONS MWH REAGAN 12.05.16 cLiiirAtE//VG e �o w•45.mj��re SEPT APPROVED or w� REAGANAPPROVED HNSON B3.20.18 WASTE U I L D I N G 4 O8NT B Jos.NO. M2 B coup NO. f 1
<br /> a4 ena o WEAKLEY 3.20,18
<br /> 4111k.Am.
<br /> B70N4L s+ APPROVED © DWG NO.
<br /> HARRIS 3.20,18 MECHANICAL MASTER EVERETT, WA 4546p m2
<br />
|