Laserfiche WebLink
GENERAL NOTES <br /> PIPING GROUP FIELD TEST REQUIREMENTS(SEE NOTES 4 AND 5) 1. ALTHOUGH SEVERAL PIPE MATERIAL GROUPS MAY BE LISPED ON <br /> FLUID EXPOSED EXPOSED BURIED MINIMUM TEST PRESSURE TEST MEDIUM LEAKAGE THIS SHEET FOR A GNEN FLUID SERVICE,CONTRACTOR SHALL <br /> FUNCTION INSULATION HEAT TRACE WELDING REQUIREMENTS ALLOWANCE <br /> ABBREVIATION SINGLE WALL CONTAINMENT CONTAINMENT PSI(SEE NOTE 6) (SEE NOTE 6) (SEE NOTE 7) PROVIDE ONLY THE PIPE MATERIAL GROUP SHOWN ON THE <br /> AIR COMPRESSED AIR GS - A <br /> DRAWINGS AND SPECIFIED FOR THAT FLUID SERVICE. <br /> CAU SODIUM HYDROXIDE PVC1,SS CATEGORY M FLUID SERVICE 125 WATERIR - (A AD) <br /> 2. CHANGE IN PIPING MATERIAL GROUP NUMBER IS INDICATED THUS: <br /> CW COW WATER CU SEE NOTE 3 125 WATER A INSULATE AND HEAT TRACE PIPING INSTALLED ABOVE GRADE <br /> DF DEFOAMER SS 125 - WATER A <br /> OUTSIDE OF BUILDING. <br /> FE FERRIC SULFATE 40% PVCs 125 WATER A <br /> HW HOT WATER CU SEE NOTE 3 SEE NOTE 2 125 WATER A 3. INSULATE DOMESTIC AND PROCESS WATER PIPING INSTALLED INSIDE <br /> HWC RECIRCULATING HOT WATER CU ,SEE NOTE 3 SEE NOTE 2 125 WATER A OF BUILDING. <br /> m 125.FOR EXPOSED PVC2, WATER.FOR <br /> IW INDUSTRIAL WASTEWATER PVC1. PVC2 PVC2 SEE NOTE 2 SEE NOTE 2 SFE NOTE B.FOR BURIED PVC2,SEE (A) 4. FOR FIELD TEST PROCEDURES ANO ADDTICNAL TEST REQUIREMENTS, <br /> PVC2,SEE NOTE B MD C. NOTE D. SEE PIPING SECTION OF SPECIFICATIONS. <br /> PO POLYMER DILUTION PVC1 SEE NOTE 2 SEE NOTE 2 125 WATER A <br /> $ PW PROCESS WATER CU SEE NOTE 3 SEE NOTE 2 125 AIR iA 5. NO SUBSRTUTIONS UNLESS ACCEPTED BY THE ENGINEER PER THE <br /> SA SULFURIC ACID 96% PVDF1 PVC2 SEE NOTE 2 SEE NOTE 2 125.FOR PVDF2,SEE NOTE B. SEE NOTE D. A SPECIFICATIONS <br /> g SL SODIUM BISULFATE 35% PVC1, SS 125 WATER A 6. TEST PRESSURE AND MEDIUM REQUIREMENTS: <br /> SL SLUDGE PVCs SEE NOTE 2 SEE NOTE 2 50 WATER A <br /> VENT AIR VENT PVC1 <br /> (A)150%OF MAXIMUM OPERATING PRESSURE.SEE PIPING SECTION <br /> OF SPECIFICATIONS. <br /> (B)150%OF MAXIMUM OPERATING PRESSURE.FOR PRODUCT PIPE <br /> AND CONTAINMENT PIPE FIELD TEST PROCEDURES AND <br /> PIPING MATERIAL SCHEDULE ADDITIONAL TEST REQUIREMENTS,SEE SPECIFICATIONS. <br /> (C)STATIC WATER TEST WITH SURFACE 10 FEET ABOVE HIGH <br /> POINT OF PIPE.FOR PRODUCT PIPE AND CONTAINMENT PIPE <br /> E GROUP PIPE FITTINGS FIELD TEST PROCEDURES AND ADDITIONAL TEST REQUIREMENTS, <br /> NO SEE SPECIFICATIONS. <br /> CU COPPER,ASTM 088,TYPE K,SOFT TEMPERED WHERE BURIED, WROUGHT COPPER OR CAST BRONZE.ASME 816.22,SILVER SOLDER JOINT,150 PSI,OR COMPRESSION FITTINGS. <br /> V HARD TEMPERED WHERE EXPOSED. (D)WATER OR AIR.FOR CONTAINMENT PIPE FIELD TEST PROCEDURES <br /> 1 GS STEEL,ASTM A53,SCH 40,WELDED,GALVANIZED. MALLEABLE IRON,ASME 616.3,THREADED,BANDED,GALVANIZED,300 PSI. AND ADDITIONAL TEST REQUIREMENTS,SEE SPECIFICATIONS. <br /> PVC1 POLYVINYL CHLORIDE(PVC),ASIA 01785,SCH 80,TYPE L PVC,SCH 80,TYPE I,SOCKET SOLVENT WELD JOINTS,ASTM D2467. SOLVENT SHALL BE COMPATIBLE WITH FLUID SERVICE. 7. LEAKAGE ALLOWANCE IS AS FOLLOWS: <br /> PV04 POLYVINYL CHLORIDE(PVC)DOUBLE WALL CONTAINMENT,PRODUCT AND PVC,SCH 80,SIMULTANEOUS SOCKET SOLVENT WELD JOINTS,ASTM D2467. <br /> CARRIER PIPE ASTM D1785,SCH 80 SOLVENT SHALL BE COMPATIBLE WITH FLUID SERVICE. (A)PIPES SO DESIGNATED SHALL SHOW ZERO LEAKAGE. <br /> PVDF1 POLYMNYLIDENE FLUORIDE(PVDF),ASTM D3222,PRESSURE RATING-ANSI SCH 80. PVDF ASTIR D3222,ANS PRESSURE RATING SCH 80. (B)PIPES SO DESIGNATED SHALL SHOW ZERO LEAKAGE FOR <br /> PVOIX POLYVINYUDENE FLUORIDE(PVDF),DOUBLE WALL CONTAINMENT,PRODUCT AND PVDF,05TN D3222,SCH 80,SIMULTANEOUS BUTT FUSE JOINTS,ASTM D2657. UNBURIED PIPE AND NOT MORE THAN 0.02 GALLON PER HOUR <br /> CARRIER PIPE ASTM D3222,SCH 80. PER INCH DIAMETER PER 100 FEET OF BURIED PIPE. <br /> SS STAINLESS STEEL,TYPE 3161,ASTM A312,SCH 40S. STAINLESS STEEL,TYPE 3164 THREADED,WELDED SUP-ON FLANGE ASME 816.3,OR SOCKET WELDED FITTINGS SCH 40S. <br /> PIPES SO DESIGNATED NOT SHOW A LEAKAGE OF <br /> SS STAINLESS STEEL TUBING FOR PIPING SIZES FOR LESS THAN 1',TYPE 316L,ASTM (C)THAN 0.15 GALLON PER HOUR PER INCH OF DIAMETER PMER <br /> OORE <br /> A312.SYSTEM SUBJECT TO ASME B31.3 CATEGORY M FLUID SETMCE WHERE NOTED. 100 FEET OF PIPE. <br /> (D)PIPES SO DESIGNATED SHALL NOT SHOW A LOSS <br /> OF PRESSURE OF MORE THAN 5 PERCENT. <br /> 8. INSPECTION AND TESTING SHALL BE IN ACCORDANCE WITH <br /> APPUCABLE PLUMBING CODE. <br /> 9. INSPECTION AND TESTING SHALL BE IN ACCORDANCE WITH <br /> APPLICABLE NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS. <br /> 10.PIPING MATERIALS SHALL BE IN ACCORDANCE WITH NATIONAL FIRE <br /> PROTECTION ASSOCIATION STANDARDS. <br /> 11.FOR PIPE UNING AND COATING.SEE SPECIFICATIONS. <br /> 12.PROPRIETARY NAMES HAVE BEEN QUOTED FOR IDENTIFICATION <br /> PURPOSES ONLY.SUBSTITURONS WILL BE PERMITTED SUBJECT TO <br /> PROVISIONS OF THE SPECIFICATIONS. <br /> 4 <br /> i <br /> s.e <br /> 1 <br /> g 100%DESIGN-ISSUED FOR CONSTRUCTION ® Stantec <br /> DATE <br /> M REVISION BY APPROVED DATE STM PE5510N BY APPROVED DATE <br /> ACCEPTABILITY DOWDRANS 3.20.18 SUBDUE CURRENT REVISION SYMBOL DATE <br /> SY <br /> •`0•.. THIS DESIGN AND/OR <br /> CHECKED PIPE SCHEDULE ORIG 3.20 <br /> ( �/ ,.ti� 4.( SPECIFICATION IS APPROVED WEAIQEY' 3.20.18 SHEET,' APPROVED<N DEPT. DATE CHECKEY3.20.181RWASTEWATER TREATMENT PLANT MZQ ( " j ) <br /> am- ` :5408 CHECKED <br /> A _ a JOHNSON 3.20.16$ APPROVED BUILDING 45-08 JOB NO. 0--- <br /> r <br /> o'a.19NAY 06 WENCAPPH 3.20.18 DWG N0. <br /> HARRIS 3.20.18 MASTER EVERETT,WA 45-08-M2a <br />