Laserfiche WebLink
® O O O <br /> CONSTRUCTION NOTES: <br /> • 1. DEMOLITION CES <br /> WATER(PR)NAIR,SON THIS AND DRAIN SHEET <br /> ONLY EFERETO 1M0160pTRO FORSS <br /> DEMOLITION NOTES ON PROCESS PIPING. <br /> REMOVE PW AND NR PIPING. CUT AND CAP AT EAST WALL. <br /> . [> HW,CR,AND DRAINS TO BE RELOCATED DUE TO INSTALLATION <br /> OF NEW DOOR BETWEEN OFFICE AND MCC ROOM. <br /> ® CONTRACTOR TO FIELD DESIGN AND AS-BUILT FINAL PIPING AS <br /> REQUIRED TO ACCOMMODATE ME RELOCATION OF THE MCC <br /> MAN DOOR FROM THE SOUTH WALL TO THE WEST WNL <br /> RELOCATE EXISTING LARGE SCREEN TV IN OFFICE/CONTROL <br /> ROOM PER OPERATOR INSTRUCTIONS ON DESIRED LOCATION'IQIIII'I 'I'II'FLI, <br /> HB-2 1'HW&1'CW UP NI U A <br /> __ 1M110 M5Q§ <br /> 1/4 MMC UP IA` i 3/4' R LP <br /> I T� -_ _ .tii '" _.__.__—_:_ INSULA RpH<SUCTION AND LIQUID PIPING <br /> - <br /> - p-5 SEE ROUTED IN CEILING CAVITY SIZE A5 SCHEDULED <br /> 2'PR UP 1-1/4' i.'ERED WATER _ s 11 1'NR UP AND DN TO / <br /> TO P-2B t� .-EL.'-'0,-====P-S. <br /> -_o= -=_ 1 A 1 l`M501 0 DRY FIRE STSTEM <br /> Mg II = 1-1/4.co�FFICE/CONTROL ROOM + <br /> }Ml}p{x501 _f /// ���) fI 16'X20' _ <br /> 2'AIR UP1 <br /> B IBJ ---- �� elmn <br /> .`Ti Hi 11 <br /> ' 'PW ONK00 =_ �� <br /> LOCATE 2-1/2'PW AND 3/4'NR = 1 =0 M506 0 <br /> UADERGROUNDALOES SERVING - V. 111213 <br /> __ <br /> UJDERGROUND PPES 5 FT 1 ^'I �s <br /> ABOVE GRADE _...___ __ _ <br /> 1 1/4'NR - - �#x� - -: ROUTE AS HIGH AS POSSIBLE <br /> 1-1/4'GRAVITY <br /> a:'o -a:=_==-a====_m___5....,=---__: ^tads,.:... _ =m ---= .PZJAMIii d=.c�..�.sa��== _ O <br /> CONDENSATE <br /> • , <br /> ---- _-SUPPORT-TYP,SCC = t I <br /> I t/4'N 1M110 M502 A�`� CLEANOUT ABOVE CEILING �, <br /> 1-1/2'ORAN DN = 4 P-1 -- <br /> ksze <br /> INDIRECT RAJN(RGE'.L�O'a ' or 1 ,,, ....... ... <br /> TRENCH ORNN(4 r � -�-� 'gyp <br /> - FILTER PRESS=1== 7t _pt� '�,! 1- 2D P <br /> O O (FLT-610)PRE) �: __. ... �� <br /> 1-I/2'INDIREC DRAINS HORIZONTAL EXTEND WALL CLEANOUTS THOU CABINET BASE <br /> s O IN WALL(2 TI') SO ACCESSIBLE BELOW COUNTER <br /> I/2'HW&1/2'CW UP <br /> 3/4'NR ON TO ALTER PRESS (I MCC <br /> 16'010' <br /> PROCESS AREA P-5,SEE 1-1/4'NR UP <br /> 1M110 M501 fig. <br /> 011 <br /> 1'HW t CW UP <br /> ES <br /> 1111i4P0.-- 1/2'WC UP <br /> 2'PW DN TO 1-1/4'TEMPERED 4,0. <br /> EQUIP CONN TO P-2A SEE 3 ZS <br /> .i..-,.: <br /> -,,-,,..4 - <br /> 3/4'NR ON TO MFR 1 M1 1.01 Kt.. <br /> PRESSURE REGULATING STATION .= PALLET RACK <br /> O . I . c (OWNER PROVIDED) <br /> �I%� Il IM IIT auk I �_� i I 1I ©l� <br /> r •-- 1 0�.6 <br /> �;iw1i�I � if ] i f l it L 1� "�. ,r <br /> J �.�� g - t ,-'� MAIN ENA._ G i t/2'HMC UP <br /> ..._.-.::•,� •.•.,'..,m.7 SU":747;:i.,' '��O=�A�,'M- �'_ U PA. l 1 = 1M110 M501 3/4'HW <br /> R-FT {LOOK ��=T ... _ Id <br /> .V.i'. 3/4'PW UP <br /> �1 1/4'MR .` ---1- <br /> I i1e PREVENTERS STACKED W 3 FT FRONT _ `iffS HB-1 <br /> ��I'� LL M 6;�'� CLEAR SEE� <br /> FA_ <br /> 2 1/2 CW UP P-3 TERMINATE 1-1/2'INDIRECT WASTE ABOVE <br /> 1, //`►I = ADJACENT PROCESS WASTE COLLECTION TRENCH <br /> U1 r M501 0 , <br /> /� 1M110 M51 • = 3ES�CNREMveowDEO) <br /> /�Ij o x is� _ <br /> 2' '�/l,, M 'li 0 _ EN9NNCAIR WEO SEE -4,SEE 3/4'NR UP <br /> HB-2 -"'""'""""""" "'".' _ ;,=III �0�0� _ n = iM110 M504 P 1M110 M501 <br /> 1' /�I�� 4' '• IES,<tcti 2'PW UP 2-1/2'NR LIP <br /> `�� 2'PW UP HB-3 - •'• P-5,SEE 2 2'GIS UP <br /> '� _ �� ;_ _ 1M110 M501 i <br /> 42024' 8' <br /> ratcarsrA <br /> ;NW Wil,,, I_r—t_ MIIM.o.41 2'GAS MRU WALL APPROX 3 FT ABV GRADE <br /> SCALE: 1/4"=1'-0" <br /> \....._,/ © HB-2 3'(100°SI)PROC AIR PROVIDE 2'SEISMIC SHUTOFF <br /> O 4'CR ON TO BELOW DN TO BELOW GRADE (EARTHQUAKE)VALVE <br /> FOOTING SEE C291 TRMSITON TO HOPE AB GAS(BELOW <br /> GRADE WITH STEEL SLEEVE GRADE EXTEND20 FT FROM IRNLETS/OUTLEIS TO BUILDING4 <br /> 100% DESIGN - ISSUED FOR CONSTRUCTION FIRST FLOOR PIPING PLAN Q THRUSLAB AND LONG REMOVAL tantec <br /> RADIUS SWEEP BELOW 7,1/C GAS METER BY PSE 880 <br /> SCALE: 1/4'=1'-0' FOOTING SEE C291 CFH LONGEST RUNOUT 50 FT <br /> STM REVISOR BR APPROVED DATE STM PENSION BY APPROVED DATE ACCEPTABILITY DRAWGNII•ENKO DA <br /> T20.18 SUBTITLE CURRENT REVISION SYMBOL DATE <br /> A WWTP-ISSUED FOR CONSTRUCTION-RECORD 10011818 URS HAMILTON 11.14.12 US DESIGN AND/OR FIRST FLOOR PIPING PLAN B a.zo.le <br /> B RCP-REMOVAL NW WEAKLEY 12.05.16 APPROVED er IS APPROVED WEAKLEY 3.20.18 SHEET <br /> 1 ce BOE/A/G® 13.20.18 <br /> HEINEtX TITLE WASTEWATER TREATMENT PLANT 1 M 110R <br /> r'� JOHNSON 3.20.18 <br /> `� <br /> APPROVED BUILDING 45-08 NO. <br /> COM <br /> WEAKLEY 3.20.18 <br /> '°A/0""L 11HARRIS 3.20.18 MECHANICAL MASTER COL.A-D/1-6 EVERETT, WA 005 N0' 45-08-1M110R <br />