Laserfiche WebLink
O O <br /> 0 0 ® v CONSTRUCTION NOTES <br /> :,.7 ,---..:,- _ - _ c _ _._ _ _ _ NEW DOOR TO BE INSTALLED.HOT WATER AND COLD WATER <br /> UNES MAY NEED TO BE RE-ROUTED(FIELD VERIFY).2 EXISTING <br /> T- DRAINS ARE ROUTED THROUGH WALL AND DRAIN TO TRENCH <br /> ABOVE FINISH FLOOR-DRAINS WALL BE RELOCATED BELOW OFFICE <br /> AND MCC FINISH FLOOR.DRAIN INVERTS SHALL DRAIN TO TRENCH <br /> SOUTH OF OFFICE AND MCC. <br /> = I ©PROCESS WATER SHALL BE CONVEYED TO THE POLYMER <br /> BLENDING UNIT- <br /> CAP PW AT EAST WALL <br /> I II ®CONTRACTOR TO FIELD DESIGN AND AS-BUILT FINAL PIPING AS <br /> REQUIRED TO ACCOMMODATE THE RELOCATION OF THE MCC MAN <br /> DOOR FROM THE SOUTH WALL TO THE WEST WALL <br /> RELOCATE EXISTING LARGE SCREE,!N IN OFRCE/CONTROL ROOM <br /> PER OPERATOR INSTRUCTIONS ON DESIRED LOCATION- <br /> i :1., =--=__ Nom$ P-28 <br /> 1 HB-2 1'/&1"CW UP a� JR <br /> Il <br /> 1M150I\ <br /> 6 <br /> 17M <br /> --�- - - ----_ _. _- __ __ - Inn 's_ ._.. 4` • �M I— - - - - O <br /> .. 4 C ' u <br /> •• 2"PW UPF •� 1'AIR UP AND DN i0 INSULATED REFRIGERANT SUCTION <br /> 1:0_,‘,..7.PERED WATER DRY FIRE SYSIE1l AND UOUID PIPING ROUTED IN <br /> e . ` , ♦ - EQ TTI i`� P-5 SEE e FFICE/CONTROL ROOM COUNG CAW(SIZE AS SCHEDULED <br /> O O 1M1t0 M501 t-1/4'c0 L� <br /> 1M110 M501 16'X20' <br /> o• � <br /> 2'NO UP ( _�O- 8 � —'. I •� THP-IBI <br /> gd ===1. <br /> e I � � � �0 p � � 3/4 NR .— <br /> L _ J e 2-+/2'WI AND ©� i F'M506 <br /> _ -1/4'NR VALVES SERVING POLYMER UNIT 12 <br /> HP-1A <br /> 8 <br /> NDERGROUND PIPS 5 FT —A A—A ,�, ? <br /> OVE GRADE I 3:f3 I — <br /> 1 e1/4"AIR _ - _- lip I o L1-1/4. RA CONDENSATE <br /> _nc - - J-= FM - 1---"'a --"7s __ ROUTES HIGH AS POSSIBLE <br /> x:z <br /> F aLt <br /> iffami AO <br /> 1 1/4'AIR - 3 - a "�I ; —=1 • <br /> • ..OUT ADOVE CBUNC <br /> _� - ,_���=I 1-1/2'DRNN DN WI �,� <br /> INDIRECT DISCHARGE TO © �1 �I <br /> ._... .- TRENCH DRAIN(4 TYP) <br /> © ' ' o — 'liiiiill illiiiiiiiiiifllilliiiiiii� =1 <br /> • ..„...--„,-i7.--,,11.% ,-,2 LIP <br /> I . _ -II __ ,1-1/2'INDIRECT DRAINS HO' . AL ` WEND WALL CIEPNOUIS 1HRU <br /> __ IN WALL(2 TAP CABINET BASE SO ACCESSIBLE <br /> I DE...2 11111/2"IRV&1/2'CW UP BELOW COUNTER <br /> 3/4"AIR ON TO FILTER PRESS E=P.. MIC <br /> ill16X10' <br /> I PROCESS AREA P-5,SEE .FA!"... I 1-1/4'NR UP <br /> 1M110M501-- _!?�, <br /> == 1'HW&CW UP <br /> -- LTAW/ 1/2'HWC UP <br /> 1-1/4'TEMPERED WATER Iyl <br /> TO P-2A SEE?, __ I1 <br /> PF <br /> 1M1__ PALLET RACK <br /> © IH _ L::-.._ =_e=_ - ( TIER PROVIDED) _ - /4 MR OW ED / 3 ,^rUP} <br /> lifik.•_ F; _ -_ ® I 1 to ,6 <br /> 21 <br /> �•I�d 2-t/2'cW AND 3"Pv(BAGKFLow MAINTENANCE AREA <br /> ()01 , P I __ - PREVENTERS STACKED M J FT FRONT SEE i 6'X23.5 I 1/2'Hwc UP <br /> ;::.� Q` I ® LEAR P-a,SEE J/4.Hw <br /> "'� e• - 1M110 M501 1M110 M501 J/ cw <br /> i IIW�� ` =a 3/4'PW UP <br /> 1 1/a'NR DN 1�.. =��1.�t�IILL---- ==_==m �a __ —====�s1=_E � ; __ •F ii, <br /> 0 - 1.,1%.,,. <br /> I/ _ D- <br /> 1!ty = E=s _. <br /> ' �� �— I -- �._ P-3 I ADORETERMINATE 1-1/2'INDIRECT WASTE <br /> P-5, `L �_ 'IIIkraito. <br /> 11 ll© _ 3'�PROCESS NR DN I P80VE ADJACENT PROCESS WASTE <br /> 1M110 M501 - v DESKCOLLECT ONTRENCH- _ OSE (OWNER PROVIDED)71/ <br /> LLE. � <br /> 2'PW I 0 0 ii .I -- NRI SERNCEAft F-1 pI <br /> SEEJ/4'NR <br /> 4 UP <br /> He-2 E�' III I -- -- SEE P-4, <br /> M504 1M1 ' <br /> �_� 2'NR I I • 2-1/2"NR UP <br /> 1•PW - I-� 2 PW UP I I <br /> � - `Ir i 2'PW UP HB-3 1'r' P-5,SEE <br /> -1-- ` .. -• :. 1M110 M501 2 di <br /> 4' 2' 0 2' d' 8 <br /> i —_—� -� <br /> 2'PW —.o,.., ``2'GAS 1NRU WALL APPROX 3 FT ABV GRADE —im—�. _ <br /> ' HB-2 ` DN3'(100 BE-Q ESS PROVIDE 2'SEISMIC SHUTOFF SCALE: 1/4°=1'-0" <br /> 4'CW DN TO BELOW TO LOW (EARTHQUAKE)VALVE <br /> - _� <br /> i <br /> FOOTING SEE C291 TRANSRION TO HDPE GAS(BELOWEXTEND POE REGULATOR VENT AT LEAST <br /> GRADE WITH STEEL SLEEVE GRADE BY PSE) 20 FT FROM INLETS/OUTLETS TO BUILDING ® Sta ntec <br /> SCALE: /4'=1'-0' <br /> 100% DESIGN ISSUED FOR CONSTRUCTION FIRST FLOOR PIPING PLAN TRADIUS SWEEP BELOW 7.1VC GAS METER BY PSE <br /> NR°SLAB AND LONG <br /> \:, FOOTING SEE C291 CFH LONGEST RUNOUT 50 880FOOTING1 <br /> DRAWN 017E SUBTITLE CURRENT REVISION SYMBOL DATE <br /> SYM REASON Br APPROVED DATE STM REYSION B, /APRONS) DATE 0.j,TAA. ACCEPTABILITY SERVO/KO 3.20.18 FIRST FLOOR PIPING PLAN B 3.0.18 <br /> A WNW-ISSUED FOR CONSTRUCTION-RECORD 10011818 URS HAMILTON 11.14.12 As,. NIS DESIGN AND/OR Dim <br /> 8 WWIP-MODIFICATIONS WI WEARIER 12.05.16 e)LAWASrEZAW <br /> a 1, SPECIFICABON IS APPROVED /WEAVE£, 310.18 TnIE WASTEWATER TREATMENT PLANT SHEET 1 II <br /> ® < APPROVED Br DEPT- EWE WEDIO-EYJ20.,B1 M 1 1 0 ..�. I/a CHECKED <br /> `s JOHNSON 3.20.18 BUILDING 45-08 JOB NO. <br /> op 45.,A ro APPROVED <br /> eBJ/wwAL;+ ED 3.20.18 MG NO- <br /> HARRIs 3.20.18 MECHANICAL MASTER COL. A—C/1-6 EVERETT, WA 45-08-1M110 <br />