Laserfiche WebLink
, <br /> , <br /> Jane Zimmerman <br /> From: Jane Zimmerman <br /> Sent: Monday,April 18, 2016 9:19 AM <br /> To: 'Gomez, Martin H' <br /> • Cc: Page, Gayle M;Tyler, David D; Larmay, Russell T; Paul McKee; Kirk Brooks; Sabrina <br /> Fandler; Benyam Stephanos <br /> Subject: RE: Preliminary Stormwater Design for 45-61 Building <br /> Tracking: Recipient Read <br /> 'Gomez,Martin H' <br /> Page,Gayle M <br /> Tyler,David D <br /> Larmay,Russell T <br /> Paul McKee <br /> Kirk Brooks Read:4/18/2016 9:19 AM <br /> Sabrina Fandler Read:4/18/2016 9:22 AM <br /> Benyam Stephanos Read:4/18/2016 9:27 AM <br /> Hi Marty— <br /> As far as I'm concerned,you've pretty much already provided the deliverables required—and I'm the one who will be <br /> signing off on the stormwater aspects of this project. If you would please add a .pdf showing subbasin 9 from the <br /> Stormwater Master Plan, and that portion of the accompanying table that shows the assumed/actual%impervious <br /> you've stated below, I would be satisfied. , <br /> At this point, I would recommend you go through whatever process you went through to get approval of the first two <br /> new buildings. And when the plans for the glycol storage building come back to me for review, I'll attach the documents <br /> you've provided and this email, and we'll be good to go. <br /> Wherever possible in this complicated world of stormwater, I still like to keep things simple...© <br /> Thanks, <br /> Jane <br /> Jane Zimmerman, Sr. Engineer <br /> City of Everett Public Works Department <br /> phone:425-257-8885 fax:425-257-8882 <br /> e-mail:jzimmerman(a everettwa.gov <br /> From: Gomez, Martin H [mailto:martin.h.gomez@boeing.com] <br /> Sent: Friday, April 15, 2016 4:36 PM <br /> To: Jane Zimmerman <br /> Cc: Page, Gayle M; Tyler, David D; Larmay, Russell T <br /> Subject: RE: Preliminary Stormwater Design for 45-61 Buildin _ <br /> 1/ty <br />