Laserfiche WebLink
• <br /> Seocindary Part Schedule <br /> Mark Part Thick. Depth Detail <br /> - G13 08C1809417DD00 0.0600 8 1/2" 1S01G2 <br /> 2 • <br /> T <br /> -----------_----------- <br /> --_------- <br /> ------_ <br /> _---------- ------------------- -------- I <br /> ,----- <br /> - <br /> \ G13 G13 <br /> 0 <br /> Co <br /> . <br /> '-I OPEN to15' Elev. <br /> 0 <br /> I <br /> 6W3B0 6W3B1 <br /> A <br /> 4 t-LEN <br /> G, O <br /> 18'-10" 16'-10" et m - 0 X <br /> CL <br /> 37'-8" ik' <br /> EL SECONDARY >F rramrpG ATA EL AQ «;�'�T *5) �ti� <br /> ifir JONAL <br /> 2/25/2016 <br /> • <br /> Shape Name=Skydrol Mule Storage,Wall=3 FOR CONSTRUCTION <br /> w 1.UNLESS NOTED,USE 1/2 X 1 1/2 A325-N BOLT(49080)AND NUT(47120) THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF <br /> W/O WASHERS.SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS. TO THE WORK PRODUCT OF VP AND VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED VP Buildings <br /> 2.FLANGE BRACES ARE AN INTEGRAL PART OF THE STABILITY OF THE DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 SECONDARY ELEVATION AT A <br /> d STRUCTURAL SYSTEM AND MUST BE PROPERLY INSTALLED PRIOR TO ERECTION REQUIREMENTS SPECIFIED BY VP.THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> 8 OF WALL AND ROOF SHEETS. VP ENGINEER'S SEAL DOES NOT APPLY BUII DINGS REV DATE BY DESCRIPTION BUILDER Commercial Design Consultants lea <br /> cusroMER 15-023031 <br /> ri<< 3.REMOVAL OR ALTERATION OF ANY COMPONENT IS PROHIBITED. TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE 1 02/22/2016 SHV FINAL DRAWINGS Boeing Commercial Airplane Group DATE <br /> A _ ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS LOCATION Everett,Washington 3/28/2015 <br /> W FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS g VP BUILDINGS DRAWNICHECK <br /> PROJECT BoeingSkydrol Mule Storage VARCO PRUDEN <br /> $ DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, - Y 9 SHV COP <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. BUiLDEms POu A Biuescope steel Company PAGE <br /> NTS 15-1208 VPC VERSION: 2015.2c 16/a <br /> FILENAME: C:\Vision\Building Files\5-023031\Boeing Skydrol Mule Storage_SECONDARY ELEVATION ATA.dwg SAVE DATE:2/22/2016 SAVE TIME:09:21:55 LAsrRAvRoeY: vargs ,aRA i8weScope&Iings North Amenc,.Inc <br /> . <br />