Laserfiche WebLink
Seccmdary Part Schedule <br /> Mark Part Thick. Depth Detail <br /> Q4 08C2505417LL00 0.0600 8 1/2" 1001FQ <br /> CT) O O <br /> r <br /> I I <br /> 11 <br /> 10 p 0 <br /> — G14 G14 — <br /> '106 <br /> 0 <br /> I <br /> Eo <br /> -I <br /> .i OPEN to15' Elev. <br /> I <br /> in <br /> 'a <br /> ,1536 <br /> O'''''w� <br /> 6W4B1 6+84B2 <br /> 'Lt 26'-6" If 26'-6" © 4 ALLEN <br /> CL 55 CL-0 CL / �4, 0* WAS* 1 <br /> A As d <br /> SECMIDARY ELEVATION AT 2 + <br /> 1144, <br /> Bracing Part Schedule 0 <br /> ,• ,47>'9, Q let <br /> Part Q 1 Length Detail +►,14" ' �� <br /> 05RS3106 2 31'-6" MOM, BR02J1 r0NA ti <br /> 2/25/2016 <br /> ' 2 2'-11 15/16" 2 GE2%200 <br /> 1 1'-0" 1 GFA206 <br /> 0 Dimension Key 0 Part Mark Key Shape Name=Skydrol Mule Storage,Wall=4 FOR CONSTRUCTION <br /> '" 1.UNLESS NOTED,USE 1/2 X 1 1/2 A325-N BOLT(49080)AND NUT(47120) THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF <br /> W/O WASHERS.SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS. TO THE WORK PRODUCT OF VP AND VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED VP Buildings SECONDARY ELEVATION AT 2 <br /> 2.FLANGE BRACES ARE AN INTEGRAL PART OF THE STABILITY OF THE DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 <br /> SSTRUCTURAL SYSTEM AND MUST BE PROPERLY INSTALLED PRIOR TO ERECTION REQUIREMENTS SPECIFIED BY VP.THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP REV DATE sY DESCRIPTION MISER <br /> S OF WALL AND ROOF SHEETS. VP ENGINEER'S SEAL DOES NOT APPLY BUD DINGSCommercial Design Consultants 1 5#-023031 <br /> 3.REMOVAL OR ALTERATION OF ANY COMPONENT IS PROHIBITED. TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE 1 02/22/2016 SHV FINAL DRAWINGS CUSTOMER Boeing Commercial Airplane Group DATE <br /> 0 <br /> ,. w - ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS LOCATION Everett;Washington VP BUILDINGS 3/28/2015 <br /> a FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS DRANRIICHECK <br /> PROJECT BoeingSkydrol Mule Storage V"R OPDAOE' <br /> $ DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, Y 9 SHVCOP <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. NTS �"wER's POD 15-1208 A BlueSrope Steel Company PA <br /> VPC VERSION: 2015.2c 17/-- <br /> FILENAME C:\Vision\Building Files\15-023031\Boeing Skydrol Mule Storage SECONDARY ELEVATION AT 2.dwg SAVE DATE.2/22/2016 SAVE TIME:09:22:03 IAsT saVE°eY. vargs aclonsan of RWescope BOUEings North Amer..,Inc - <br />