Laserfiche WebLink
ERECTION NOTE: AT EAVE STRUT BEND PBA TABS ;LNU tHAML INI. I-KAML IN I. t NAME IN I. tAAM:: <br /> • <br /> BRACE g FRAME BRACE . AND USE (2)11/32" X 1 1/4" T-45 GRAY CL CL <br /> LOGAEON 10CR/I3N ROOF - SCRUBOLT (097352) AND SCRUBOLT NUT(097267) END BAY I INTERIOR BAY <br /> SECONDARY WHEN A CHANNEL BRACE DOES NOT LINE UP WITH ANOTHER <br /> MEMBER CHANNEL BRACE OR THE SLOTS IN THE PURUN WEB FOR (HEAD OF SCRUBOLT TO BE ON OUTSIDE OF EAVE STRUT) <br /> ( (1) PURLIN BRACE 1 PURLIN BRACE <br /> A DROP PIN CONNECTION BEND THE CHANNEL TABS TOWARD <br /> EAVE PURLIN SEE FACE OF C ] O O 0 ] 0 0 <br /> ( ) <br /> THE PURUN WEB AND USE A SELF-DRILLER (55307) TO ATTACH. CHANNEL <br /> BRACE ASSY. EAVE STRUT VIEW CHANNEL <br /> IIEIMIIIIPIINII +, r (PBA-) FOR TAB ATTACHMENT (2) PURUN BRACE_ J ] 0 0 <br /> (2) 1/4-14 x 1 1/4" �.! CHANNELS (2) PURLIN BRACE_ 0 ] ] 0 <br /> FUNGE E (2) 1/4-14 x 1 1/4" STRUCT. SCREWS \ 3 <br /> N144%tN%10.166.. (3)PURLIN BRACE ] ] ] O CHANNELS <br /> a CLP REO'D W/ (Cr9-)0R'HEB-) STRUCT. SCREWS (55307) CHANNELS <br /> THICK FLANGES FLANGE BRACE WILL Y (55307) ► (4) PURLIN BRACE (4) PURLIN BRACECONNECT TO TIE WEB OF THEFRAME MEMBER. CHANNELS `] ] ] ] CHANNELS ] ] ] ] <br /> � \ HANNEL \ CHANNEL FACE OF <br /> / BRACE BRACE EAVE STRUT ggiF # <br /> N . :. <br /> _ 1.4 (CPB-} (CPB-) 3" TYPICAL 3" TYPICAL <br /> ALTERNATE CONNECTIONS ', CLUSTER CLUSTER <br /> /�,�— STANDARD NOTES: t STANDARD NOTES: <br /> FLANGE BRACE REQUIREMENTS: • _L ' - PURLINS HAVE CLUSTERS OF 4 HOLES FOR ATTACHING PURLIN BRACES. - PURLINS HAVE CLUSTERS OF 4 HOLES FOR ATTACHING PURLIN BRACES. <br /> RULE#1- ALL FLANGE BRACES ON CROSS SECTIONS MUST BE INSTALLED. �a �\1� THESE CLUSTERS ARE REPRESENTED BY ONE OF THE SYMBOLS BELOW: THESE CLUSTERS ARE REPRESENTED BY ONE OF THE SYMBOLS BELOW: <br /> EAVE <br /> RULE#2- SINGLE FLANGE BRACES ARE REQUIRED WHEN PART MARK ON � '� USE (2) 1/2" GALV. HEX STRUT 0 DO NOT INSTALL PURUN BRACES AT THIS CLUSTER LOCATION. 0 - DO NOT INSTALL PURUN BRACES AT THIS CLUSTER LOCATION, <br /> ill <br /> CROSS SECTION IS NOT ACCOMPANIED BY (2). \ _J, �— NUTS EACH SI)) LOCATE (1) '! <br /> RULE#3- FLANGE BRACES ARE REQUIRED BOTH SIDES OF THE FRAME WEB PURUN NUT SIDE OF PURUN , - 1 —INSTALL PURLIN BRACES AT THIS CLUSTER LOCATION. 1 - INSTALL PURLIN BRACES AT THIS CLUSTER LOCATION. <br /> WHEN PART MARK IS ACCOMPANIED BY (2). AVE PURUN SEE SECONDARY ROOF DRAWING FOR BRACE REQUIREMENTS. SEE SECONDARY ROOF DRAWING FOR BRACE REQUIREMENTS. <br /> RULE/14- WHENEVER POSSIBLE, PLACE SINGLE BRACES TOWARD THE USE WHEN CHANNEL BRACE USE WHEN CHANNEL BRACE BRACE ASSY. <br /> CENTER OF THE BUILDING. - INSTALL PURLIN BRACES AT THE RIDGE AND WORK TOWARD THE EAVE. - INSTALL PURLIN BRACES AT THE RIDGE AND WORK TOWARD THE EAVE. <br /> RULE#5- WHENEVER POSSIBLE, PLACE ALL SINGLE BRACES ON THE SAME DOES LINE UP WITH THE DOES NOT LINE UP WITH • PURLIN (PBA-)(TYP.) <br /> SIDE OF THE FRAME WEB. SLOTS IN THE PURLIN WEB. THE SLOTS IN THE PURLIN WEB. NOTE: SEE ERECTION DRAWINGS _ CHANNEL BRACE MAY BE LOCATED IN EITHER SET OF SLOTS IN CLUSTER CHANNEL BRACE MAY BE LOCATED IN EITHER SET OF SLOTS IN CLUSTER <br /> FOR LOCATION <br /> ** 10"& 11 1/2"PURLINS REQUIRE 3 BOLTS AT EACH END OF PURLIN LAP. FOR LOW OR HIGH EAVE LOCATIONS. PROVIDED THEY ARE ALIGNED FROM EAVE TO EAVE IN A GIVEN BAY. PROVIDED THEY ARE ALIGNED FROM EAVE TO EAVE IN A GIVEN BAY. <br /> Rev. Q'/OR/ORI"LNNO00 TYPICAL FLANGE BRACE CONNECTIONS DEVIATED/m/0IIA.Ram; CHANNEL BRACE ENDING AT PURLIN WEB REV ORT['R'/Lb/1211EVNR°N EAVE STRUT BRACE REV.wre5T/01/ORIWV.NO.00 PURLIN BRACE CLUSTER LOCATION RN.PAT0NUm/aN)RLY.NO.00 PURLIN BRACE CLUSTER LOCATION <br /> am BRO6AE CONT. PURLIN LAP SHOWN, CONT. GIRT & SIMPLE PURLIN BRO9JG € SELF-DRILLER WITH BENT TABS BRO9K5 BRO9RY END BAY CHANNEL LOCATION • BRO9RZ INTERIOR BAY CHANNEL LOCATION <br /> ERECTION DRAWING PART MARK <br /> LTTT-TT U LITT-TT C X2 ,/2" 25/8" sv2"CEE <br /> ADJUST. CODES ADJUST. CODES P r 00108JS1801214 GIRT FILLER <br /> ANGLE(GFA-) <br /> GAGE GAGE BL <br /> I HTH I H J v4-14X11/4" 12-24[ /A325BOLTS <br /> " (2)12"`X11,2• <br /> STRUCT FSNR <br /> IN H NGTH INCHE` LENGTH 1 W1 3 <br /> (millimeters) millimeters T B� I <br /> SHAPE SHAPE ( N <br /> PTH PT BAY NUMBER 48" 0 0 <br /> •LINT <br /> LIP <br /> CANOPY (C)/PARTITION(P)/ <br /> 0 2\i,l' <br /> 0 <br /> DEPT71 SHAPE GAGEDEPTH SHAPE GAGE ROOF(R)/WALL(W) NUMBER <br /> 07 = 7" Z = ZEE 11 = 0.113 <br /> OS = 8 1/2" C = CEE (2 = 0.098 07 - 7 ZS = ZEE 11 = 0.113 1 <br /> 10 = 10" E = LOW EAVE STRUT 13 = 6.086 08 = 8 1/2" CS = GEE 12 = 0.098 612, <br /> H - HIGH EAVE STRUT 10 = 10" ES= LOW EAVE STRUT 13 = 0.088 BUILDING SHAPE PURLIN <br /> 11 = 11 1/2' 14 = 0.079 . HS = HIGH EAVE STRUT <br /> 77 = 11 1/2" 14 =0.079 2 1/2" 2 s/s" IBENTCUP \(2Il:NXITQ.BB = BACK TO BACK CEE THE BAY/BUNDLE CODE IDENTIFIESGCE052072 T <br /> FB= FACE TO BACK CEE 15 =0.073 <br /> 17 - 0.060 'FF= FACE TO FACE CEE 16= 0.668 THE BUILDING CANOPY/PARTITION/ 1'-°° <br /> 17 - 0.060 ROOF/WALL PLANE AND BAY <br /> REV.WE:m/m/S=IRES.NO.00 SECONDARY PART MARK NUMBER '�`RAiEO'Am/NRIREY.NN'' SPECIAL SECONDARY PART MARK KEY REV.NATE:R1n1m IREv.Nam SECONDARY BUNDLE LOCATION KEY REV.0.4E0J/01/0BI'N"NO.00 PURLIN AND GIRT SIZES I FLUSH PURLINS AT OUTSET END FRAME <br /> EN51B1 COMMON GENERATED MARK NUMBERS EN51B2 COMMON GENERATED MARK NUMBERS EN51B3 ALL SECONDARY DEPTHS EN53F1 8 1/2" 216mm RS1OXD _ <br /> NOTES: NOTES: OPTION OPTION <br /> • ALL CONNECTIONS 1/2" X 1 1/2" A325 BOLTS(49080) TYPICAL U.N. A ALL CONNECTIONS 1/2" X 1 1/2" A325 BOLTS (49080) TYPICAL U.N. FOR FDA UP TO 9'x 9'USE(3)1/4"-14 x 1 1/4" FOR.FO's UP TO 9'X 9'USE(3)1/4"-14 X 1 1/4' • <br /> '* EAVE STRUCTURAL CONN. 1/2" X 1 1/4" THIN HD A307 BOLT. **EAVE STRUCT. CONN. 1/2" X 1 1/4" A307 THIN HD BOLTS (096336). MS(55307)LOCATED APPROX AS SHOWN. SOS(55307)LOCATED APPROX AS SHOWN <br /> * TRIM ANGLE ONLY REQUIRED WHEN CALLED A EAVE STRUCTURA NO CLOSER THAN 3/8"FROM EDGE NO CLOSER THAN 3/8'FROM EDGE <br /> CLIP OR HOLES.SCREW SPACING NOT OF CLIP OR HOLES.SCREW SPACING NOT <br /> FOR ON THE ERECTION DRAWINGS. AIN BUILDING LESS THAN 3/4"APART. LESS THAN 3/4"APART. <br /> A EAVE STRU "IGGYBACK CANOPY <br /> EAVE —_ A MAIN BUILDING ��,�—_� FIG O° " DIAMETER HOLES PI ZEE LOCATE AND DRILL GIRT/IBS pot- <br /> STRUCTURAL <br /> GCB- CLIP EAVE STRUT -••••••• GCB- CLIP 0 \ o TO ATTACH JAMS(2)1/2"X 1 1/2" <br /> --��(WELDED) ALSO (WELDED) OR P01 '4 x325 BOLT(49080) <br /> 0 <br /> .. "--.". GCE- CLIP �} ACTING AS GCB- CUP-�' GCE- CLIP 0 � / e �� SINGLE JAMB <br /> (BOLTED) STIFFENER (WELDED ,..2.0..l.3.2................-Awa, <br /> GCB- CLIP T ALSO A TS AS�' , t �� <br /> • O •;(WELDED STIFFENER - :.r��� • <br /> 10 JAMB BASE <br /> NJ., PG10 —�� MAIN FRAME CLIP `,_.►�_ COLUMN OR 1 4 14 x 1 1/4" A ‘00 <br /> GIRT - (2) 1/2" A307 THIN �L �+YRAFTER - S/TRUCT. FSNR. (55307) � ElF HEAD BOLT 096636 (I'/ ZEE GIRT � C.`— PIGGYBACK OPTIONAL MAW FRAME T-0" 0.C. • "" SE VA)) &NUT(095032) ' �Ir:: 1 T A '�"TRIM CANOPY 8 F GR �"ANIX.E 1/4"-14 x 1 1 4" SOFFIT PANEL - COLUMN OR OPTIONAL SOFFIT PANEL ` II @y., r d/ RAFTER �kV I0IN FIELD LOCATE AND DRILL(2)9/16' "�{.- ...t <br /> (Ta-) STRUCT. FSNR. (55307) PIGGYBACK CANOPY EXTENSION _ / -"I DIAMETER HOLES IN ZEE GIRT ( L/ <br /> 1'-0" O.C. ZEE GIRT k / ra ATTACH JnMa z)1/2'x 1 1/2" I } "A 0 <br /> SEE FRAME CROSS SECTION FOR DIM. \ A325 BOLT(49080 <br /> PIGGYBACK CANOPY EXTENSION I I (JAMB SUPPORT \ ,A A /� '. i=4 Q <br /> SEE FRAME CROSS SECTION FOR DIM. /-MAIN BUILDING MAIN BUILDING I I EAVE STRUCTURAL GIRT) \\\/// II DOUBLE JAMB ' �/ fOjRT �` <br /> ...d <br /> EAVE STRUT AT EAVE STRUT AT (2)1/2"A307 THIN CONNECTION I / S �vA <br /> RAKE EXTENSION \\\ ' SINGLE 8FF 11DN *� te <br /> t. RAKE EXTENSION HEAO BOLT(096636) <br /> /.___ 0 0_ 0 0 o a o I o I I <br /> V <br /> &@UT(095032) I DoueLE F�W��op 0 i'4.47 '9� + 40 <br /> O O 0 0 0 0 0 0 POLI I JAMB CAN BE 1 1/2"DEEPER — JAMB CAN BE 7 1/2"DEEPER 4• E <br /> \ THAN THE JAMB SUPPORT GIRT. L <br /> *WM* (ONLY EXCEPTION: 11 1 2"JAMB THAN THE JAMB 1/2" GIRT, . - �r <br /> I- <br /> D CAN BE USED W/8 1/2"GIRT) I (ONLY EXCEPTION; 11 1/2"JAMB - fONA 1� <br /> MAIN BUILDING MAIN BUILDINGJ CAN BE USED W/B 1/2'GIRT) 1�M <br /> EAVE STRUT EAVE STRUT iiiiiiI AUGN JAMB AND GIRT AT BL. EQUAL 3" EQUAL ALIGN JAMB AND GIRT AT BL. <br /> SECTION A-A SECTION A-A EAVE AT FLOATING ROOF PANEL P01 CUP =3 3/4' AT 7. 8 1/2".10'GIRTS Q PG1 CUP= 3 3/4"AT 7",8 1/2",10"ORTS <br /> SECTION A-A PGV1067 CLIP - 4 3/4" AT 11 1/2" GIRTS SECTION A-A PGV1067 CUP= 4 3/4" AT 11 1/2"GIRTS 2/26/2016 <br /> REV.0AIE:0010/14'FEY.NOW PIGGYBACK CANOPY RLC.DATE,09/I0/1A)REV.N0.00 PIGGYBACK CANOPY REV.IMTENI/30/15 IRE,NO.03 JAMB TO GIRT REV.RATC74/01/IS IREv.Na W - JAMB BASE TO GIRT <br /> " RSVO01 ALL PURLIN DEPTHS - LOW EAVE RSV003 ALL PURLIN DEPTHS - HIGH EAVE WS20B2 SINGLE OR DOUBLE JAMB. ANY ZEE GIRT WS2OH2 ALL JAMB AND GIRT DEPTHS FOR CONSTRUCTION <br /> THE VP ENGINEER'S SEAL APPLIES ONLY I HIS DRAWING,INCLUUINU I HE INI-ORMAi ION HEREON,REMAINS I HE PROPER I Y OF <br /> 1.UNLESS NOTED,USE 1/2 X 1 1/2 A325-N BOLT(49080)AND NUT(47120) - TO THE WORK PRODUCT OF VP AND VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED VP Buildings <br /> W/O WASHERS.SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS. DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 ROOF SECONDARY SEDRS <br /> 2.FLANGE BRACES ARE AN INTEGRAL PART OF THE STABILITY OF THE REQUIREMENTS SPECIFIED BY VP. THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> " STRUCTURAL SYSTEM AND MUST BE PROPERLY INSTALLED PRIOR TO ERECTION VP ENGINEER'S SEAL DOES NOT APPLY BUILDINGS. REV DATE BY DESCRPTRN BOLDER Commercial Design Consultantsri JOB <br /> - OF WALL AND ROOF SHEETS. TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATECUSTOMER 15-022921-01 <br /> 1 2/18/2016 DWVI FINAL DRAWINGS Boeing Shared Services DATE <br /> 3.REMOVAL OR ALTERATION OF ANY COMPONENT IS PROHIBITED. ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS LOCATION Everett,Washington VP BUILDINGS 2/18/2016 <br /> FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS DRAWN/CHECK <br /> • DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPERERECTION, PROJECT Boeing Glycol Load/Unload Canopy DGV�JM�OP <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. NTS BOLDER'SPOk 15-1208 VPCVERsaN: 2015.2c PA 1\\1/��� <br /> 2/18/2016 SEDSheet 12:49:20 FLENVME:Boeing Glycol Load and Unload Canopy PEMNIOnaOOASNNPNBI:IOReNNmB1Am0,NN•H0. <br />