Laserfiche WebLink
Secondary Part Soule <br /> Mark Part Thick. Depth Detail <br /> G2 08C1911412DD00 0.0980 8 1/2" <br /> O O <br /> r 7 r 7 <br /> al <br /> I I <br /> I , <br /> -I G2 1-----_ <br /> I I <br /> v. <br /> I I <br /> I , <br /> I I <br /> T <br /> '° i OPEN to 16'-0 5/8" Elev <br /> 0 <br /> iii <br /> I I <br /> RP 4 <br /> Is ce <br /> 13 <br /> I I <br /> I I <br /> 7M130I © �, ,4TEt ° ,, <br /> 1 • <br /> i E t la'-o" + jdNAt- -l <br /> . cL cr <br /> 2 l'-0" 20'-0" 2/26/2016 <br /> Br. <br /> 1 2'-3 5/8" � ELEVATION AT 1 El Bt <br /> Dimension Key Shape Name=Glycol Load and Unload,Wall=2 FOR CONSTRUCTION <br /> 1.UNLESS NOTED,USE 1/2 X 1 1/2 A325-N BOLT(49080)AND NUT(47120) - THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF <br /> W/O WASHERS.SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS. VP Buildings <br /> TO THE WORK PRODUCT OF VP AND VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED <br /> • 2.FLANGE BRACES ARE AN INTEGRAL PART OF THE STABILITY OF THE DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 SECONDARY ELEVATION AT 1 <br /> 8 STRUCTURAL SYSTEM AND MUST BE PROPERLY INSTALLED PRIOR TO ERECTION REQUIREMENTS SPECIFIED BY VP. THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> 8 <br /> OF WALL AND ROOF SHEETS. VP ENGINEER'S SEAL DOES NOT APPLY BUILDINGS - REV DATE BY DESCRIPTION WILDER Commercial Design Consultants X15-022921-01 <br /> 3.REMOVAL OR ALTERATION OF ANY COMPONENT IS PROHIBITED. TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE 1 2/18/2016 DWM FINAL DRAWINGS CUST°MER Boeing Shared Services DATE <br /> ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS LOCATI°N Everett,Washington VP BUILDINGS 2/18/2016 <br /> r. FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS oaawNcNEac <br /> ° DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, PROJECT Boeing Glycol Load/Unload Canopy �'�iOPR1 ' DWM COP <br /> A BlueScope Steel Companyh <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. NTS BLEDER'SP°" 15-1208 VPC VERSION 20152c PAGE 14)(1'4) <br /> FILENAME: C9Vision\Building Files515-022921-01\P14 Boeing Glycol Load and Unload Canopy_SECONDARY ELEVATION AT 1.dwg SAVE DATE 2/19/2016 SAVE TIME:09:02:27 LAST SAVEDav: morgd eaVE,s o,el Sapee ltlegs Natii America,Inc. <br />