Laserfiche WebLink
Secondary Part Schedule <br /> Mark Part Thick. Depth Detail <br /> G1 00108CS170241200 0.0980 8 1/2" WS12N2 <br /> eu <br /> 1 2 <br /> r <br /> ----0 .. <br /> D <br /> G1 OI <br /> , <br /> .1r <br /> - IA <br /> • <br /> m, <br /> m <br /> o OPEN to 16'-0 5/8" Eley ri <br /> Zia -4 <br /> a ELLE <br /> toy <br /> 1)0 *�..a Y 'S,gyp fit,, <br /> 7W1Bo <br /> q 17'-6" 4" 1'-3" ' 2/26/2016 <br /> 1 2'—3 5/8" 1 VCC09003072 BL SECONDARY ELEVATION AT B BI. <br /> ❑ Dimension Key Q Part Mark KeyShape Name=Glycol Load and Unload,wan=t FOR CONSTRUCTION <br /> 1.UNLESS NOTED,USE 1/2 X 1 1/2 A325-N BOLT(49080)AND NUT(47120)- THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF <br /> W/O <br /> 2.FLANGEWASHERS. <br /> BRACES ARE LIGHTEN N BOLTS AL PART OF THE SECONDARY <br /> OABILITY OF THE CONNECTIONS. TO THE WORK PRODUCT OF VP AND VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED VP Buildings SECONDARY ELEVATION AT B <br /> DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 <br /> STRUCTURAL SYSTEM AND MUST BE PROPERLY INSTALLED PRIOR TO ERECTION REQUIREMENTS SPECIFIED BY VP.THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> REV DATE BY oEscrivmm euwEa X15-022921-01 <br /> OF WALL AND ROOF SHEETS. VP ENGINEER'S SEAL DOES NOT APPLY BUIL DINGS Commercial Design Consultants <br /> 3.REMOVAL OR ALTERATION OF ANY COMPONENT IS PROHIBITED. TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE 1 2/18/2016 DW 4 FINAL DRAWINGS CUSTOMER Boeing Shared Services DATE <br /> ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS LocanON Everett,Washington2/18/2016 <br /> c 9 VP, BUILDINGS <br /> FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS wuwrrro+Eac <br /> g DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, PROJECT Boeing Glycol Load/Unload Canopy �"OPa10t1 DWM.....�COP <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. A eCVERS Stet 15.2 Company <br /> NTS BUILD PO 15-1208 vRlueSco a 20152c R" 6:2 <br /> FILENAME: C:Vision\Building FlesX15-022921-01\P13 Boeing Glycol Load and Unload Canopy_SECONDARY ELEVATION AT B.dwg SAVE DATE:2/19/2016 SAVE'nME:09:10:10 LAST SAVED By: morgd 'Amon SIB SEE EEEBSSs Nog6 Arteire,Inc. <br />