My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 45-63 2019-07-16
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-63
>
3003 W CASINO RD BLDG 45-63 2019-07-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2019 8:11:52 AM
Creation date
7/16/2019 8:11:45 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-63
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Covering Schedule a Trim Schedule <br /> Id Qty Type Start Length Gage OP Fin. Color Direction Id Parts Color Details <br /> #2 7 VR 2'-3 1/8" 24 1 K YW Left to Right Ti (1.1)HTS12, (1.1)HTS10 Cool Egyptian White WC24B2 <br /> Cper. Coc7e:1 Q, SQ WL'20B2 <br /> Finish:K=EQL (Kynar) T3 (2)HSEP1, (2)RER10-130, REF20,TA10 Cool Egyptian White RC34H4, RC35N1 <br /> Color:YW=Cool Egyptian White <br /> Fastener Schedule <br /> Part Description <br /> 0097584-101 (T-2) #12-14 x 1 1/4", 5/16" Hex Hd, SS Cap w/Washer <br /> 0097581-101 (T-1) 1/4-14 x 7/8", 5/16" Hex Hd, SS Cap w/Washer <br /> O ) <br /> T3 <br /> i (7)#2 / <br /> T1 <br /> • <br /> :r <br /> ,i <br /> a Ee- <br /> Dal c Lo O^D to •'-0 8" <br /> io <br /> . .•i <br /> // . <br /> ALLEN <br /> 1. 20'-0" <br /> I. 0 <br /> �Q * W A 8 "7 <br /> BL BL ,t• ,4„' �t) <br /> COVERING 'ICN AT 1 <br /> ii- te <br /> 13 .14 <br /> 0 "•k.47 •9�t® 4Cf <br /> +'�TE <br /> /O[t1A ..� <br /> 2/26/2016 <br /> t Shape Name=Glycol Load and Unload,Wall=2 FOR CONSTRUCTION <br /> 1.PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF VP Buildings <br /> MAY BE REQUIRED FOR HEAVY GAGE NESTED ZEE's AND/OR FASTENERS TO THE WORK PRODUCT OF VP AND VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED COVERING ELEVATION AT 1 <br /> - TO STRUCTURAL BEAMS DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 <br /> ,r 2.STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM. REQUIREMENTS SPECIFIED BY VP.THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. REV DATE BY DESCRIPTION SEEDER X15-022921-01 <br /> VP ENGINEER'S SEAL DOES NOT APPLY Run rnNGF Commercial Design Consultants <br /> 3.DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIRE TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE 1 2/18/2016 DWIdI FINAL DRAWINGS CUSTOMER Boeing Shared Services DATE <br /> FIELD CUTTING,SEE THE COVERING SCHEDULE FOR CUT LENGTHS. ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS LDCATIONE2/18/2016 <br /> Everett,Washington VP BUILDINGS <br /> 4.SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION. FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGS vnaco PwuoeN DR^K'N/�+E� <br /> i. DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, PROJECT Boeing Glycol Load/Unload Canopy DWM COP <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. BUILDERS PDF PAG <br /> NTS 15-1208 VPC VERSION 20152c 20 <br /> 2/18/2016 12:49:31 FILENAME: Boeing Glycol Load and Unload Canopy .d^..."..S B.M.WN.°A i" <br />
The URL can be used to link to this page
Your browser does not support the video tag.