Laserfiche WebLink
Covering Schedule Trim Schedule <br /> Id Qty Type Start Length Gage OP Fin. Color Increment Direction Id Parts Color Details <br /> #3 7 VR 1'-10 1/2" 24 1 K YW -1 1/2" Right to left Ti (1.1)HTS14, (1.1)HTS05 Cool Egyptian White WC24B2 <br /> Oiler. Code:1=SQ, SQ T2 (1.5)AFT05, C1E05 Cool Egyptian White WC20B2 <br /> .. Finish:K=KXL (Kynar) T3 (2)RFR10-130, RKF20, (2)RSB10, (2)RSC10 Cool Egyptian White RC10A1, RC30A1, RS10L5 <br /> Color:YW.Coo1 Egyptian White <br /> Fastener Schedule <br /> Part Description <br /> 0097584-101 (T-2) #12-14 x 1 1/4", 5/16" Hex Ed, SS Cap w/Washer <br /> Roof Struct 1 1/4 (T-2) #12-14 x 1 1/4", 5/16" Hex Hd, SS Cap w/Washer <br /> SS <br /> 0097581-101 (T-1) 1/4-14 x 7/8", 5/16" Hex Hd, SS Cap w/Washer <br /> 2 . . 1 <br /> N <br /> 7' 01 Csi <br /> 01 <br /> M7 to T3 l� C� _e�1__ <br /> �+ r— __-- �+----- --r�'_—�---- ' I - <br /> ,--iih <br /> / '4 <br /> cv <br /> < m /OPEN to 16'-0 5/8" Eley Co <br /> r c .-1 <br /> I <br /> i- <br /> // . <br /> ,. .LEN <br /> 17'-6" 1'-3" �$ 0* 4 i <br /> BL BL ' .6.. _ l,c. 10 <br /> OOVERING KLEVATION AT A <br /> '`0 : 4,' '9 Q (' <br /> 41kr,,, t <br /> IONAL. <br /> 2/26/2016 <br /> • <br /> " Shape Name=Glycol Load and Unload,Wall=3 FOR CONSTRUCTION <br /> 1.PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS THE VP ENGINEER'S SEAL APPLIES ONLY THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF <br /> MAY <br /> BE REQUIRED <br /> BEAMS FORHEAVY GAGE NESTED ZEE's AND/OR FASTENERS TO THE WORK PRODUCT OF VP AND VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED VP Buildings COVERING ELEVATION AT A <br /> DESIGN AND PERFORMANCE IN THE APPLICABLE PURCHASE ORDER AND SHALL NOT BE MODIFIED,REPRODUCED 3200 Players Club Circle Memphis TN 38125 <br /> 8 2.STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM. REQUIREMENTS SPECIFIED BY VP. THE OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VP <br /> x REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. VP ENGINEER'S SEAL DOES NOT APPLY Rt Ill PINGS REV DATE BY DESCRIPTION WIDER Commercial Design Consultants JOB <br /> 15-022921-01 <br /> ri3.DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIRE TO THE PERFORMANCE OR DESIGN OF THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE 1 2/18/2016 DWM FINAL DRAWINGS CUSTOMER Boeing Shared Services was <br /> 4c FIELD CUTTING,SEE THE COVERING SCHEDULE FOR CUT LENGTHS. ANY OTHER PRODUCT OR COMPONENT GOOD QUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS LOCATION Everett,Washington VP BUILDINGS <br /> 2/18/2016 <br /> .SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION. FURNISHED BY VP EXCEPT TO ANY DRAWING,DETAILS REFERENCED IN THIS DRAWING,ALL APPLICABLE VP BUILDINGSVARCoRnVnacNECK <br /> 8 4.SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION. DESIGN OR PERFORMANCE ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, PROJECT Boeing Glycol Load/Unload Canopy OPR1 ' DW COP <br /> REQUIREMENTS SPECIFIED BY VP. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. a smeswpe Steel <br /> t company <br /> NTS amLOQ�pO" 15-1208 VPC VERSION 20152c ° 21l�� <br /> FILENAME: C:1VisionlBuilding Files\15-022921-01iAS BUILD ACAD FILE\P21 Boeing Glycol Load and Unload CanopyCOVERINGELEVATION AT A.dwg SAVE DATE.2/25/2016 savenMe:06:25:48 LAST SAVED BY: morgd a dnnvon of no Scone BtnlangsNamAme,;e.Inc <br />