Laserfiche WebLink
moisturc conditiuned. It ma}� be necessary to import sand and gra��el «�ith a low tines content to achicve <br /> adcqualc compaction for support of pavcment arcas, floor siabs and structures for wct wcathcr <br /> construction. Imponed stmcteral lill eonsisiing oC sand and gravel (1VSDOT gravcl borrow) should he <br /> pl:�nncd undcr all building Iluor slabs and foundation dcments and if construction occurs during �ect <br /> wi;ithcr. <br /> The use uf aristing u7-sitc tili soils .�s stnicwral fill durng wet wcather should be planned only for areas <br /> requiring compaction to 90 percent of�tUD, as long as ihe soils are properly protected from wet wcather <br /> ancl nut placed tiuring periods of prccipi�atian. The contrac�or should plan lo cover and maintain all fill <br /> stockpilcs with plaslic shccting if it will be used as struc�ural fill. The rcusc of on-sitc soils is highly <br /> dcpcnden[ on thc s:<ill of thc conlractur and schcdulc, and �ac �.vill work with thc dcsign tcam and <br /> contracmr to maximize the rcuse o(on-site till tioils during the wet and dry seasuns. <br /> �ill Plncement and Compactinn Criterin. Siructural fill should bc mechanically compacted ta a firtn, <br /> non-yiclding condilion. Sln�ctur�l fill should L•c pl;:ccd in loosc IiRs not cxcccding �3 to 10 inchcs in <br /> thickness. The actual thickncss wil! 6e dependcnt on the stmctural fill matcrial used and thc ripe and size <br /> uf compaction equipment. �ach IiR sha:ild be canditioned to the proper maisture content and compacted <br /> to thc spccificd dcnsity bclixc placing subscqucnt IiRs. S�ructural till should bc compacted to thc <br /> fullowing critcria: <br /> i. Strucwral �iil placcd bchind bclow-gradc walls should be compacted ta bchveen )0 to 92 percent <br /> oF thc MUD estimated in accordance with AST�I D I»7. Care should be taken when <br /> cumpacting fill ncar thc facc of bclow-grade �valls to avoid ovcrcompaction and hcncc <br /> ocrrstressing Ihc walls. I�land-uparatcd compactors shuuld 6c uxd within � Ccet b:;hind thc wall. <br /> �1';ill b:icktill plucecl within Ihe building (outprint and under the second flour Ievel should te <br /> cnmpacicd to bctwccn 90 ro 92 perecnt o� thc �IDD within � fcc[ oC the walls and to at Icast <br /> 9� percent of the MDD b�Vund 5 fcet of tl�c ��•alls. "Chc upper 2 fcet oF fill bclow �loor slab <br /> subgr;�dc should also be compacted to at leas[ 9� percent of thc �tUD. 'lhz contractor should <br /> � kc�p :dl heuvy construction equipmeut awa}' ����m the �op uf retaining walls :; dis-tance equal to <br /> unohalf the hcight of tlic wnll, or at Icas[5 fcct, which cvcr is grc:ucr. <br /> ?. titructural till in new pavement and hardscape areas, including utility trench bat4fill, should be <br /> cumpacled to at Ieast 90�ercent of tlie �IDD atimated in accord:�nce with r1STh1 D 1�57, exeept <br /> that Ihc upper 2 fcet of till bclow final subgradc sl�ould bc compactcd ro at Icast 95 perecnt of thc <br /> :�II)D, scc Figurc�4. <br /> - 3. :,hiictural fill placed bclow Iloor slabs and foundatiuns shuuld be compacted to 95 percent uf the <br /> i�tUD estimated in accordance�vith e\STbt ll 1�57. <br /> 4. :itnictural fill placcd as cnisficd rock basc coursc below pavcmcnts sliauld bc compactcd to <br /> 95 percent of the �1DU estimated in:ucordance with ASTM D I�57. <br /> 5. Von-stnicturnl lill, such as fill placed in landscapc areas, should bc compacted to ai Icast <br /> 35 percent of thu MUD cstimated in accordance with r\STM D 15�7. In arcns intended ror fiiture <br /> devclopment, a higher degree of compaction should be considered to reduce the se�dcment <br /> potcntinl of thc fill soils. � <br /> �Ve:ither Considcr:rtions. Disturb:mcc of nc�r-surface suils should be cxpectcd if earthwork is <br /> rumpictcd dm'ing periuds of�vct wcathcc During dry wcathcr, th�: suils will (I)hc less susccptiUlc to <br /> disturbancc. 1_') pruvidc bcticr suppurt tor ronstnution a;uipment, and (3)be more likely to mcN. the <br /> rccpii�c�l cump.ictinn rriteriu. <br /> i�ll,�:'�,_!:nl:+.,�r�r bu �� ������� � Pa�cB GEOENGINEEIIS� <br /> .Lnn 'f.:l:u� <br />