INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:05 AM
Creation date
7/17/2019 10:32:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
6/19/2019
Department
Public Works
Department Project Manager
RICHARD HEFTI
Subject / Project Title
WATER MAIN REPLACEMENT T
Public Works WO Number
UP3684
Amendment/Change Order
Change Order
Amendment/Change Order Number
3
Tracking Number
0001600
Total Compensation
$29,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc 12/27/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Watermain Replacement"T" <br /> Change Order No.3 <br /> Change Order Effective Date: June 5, 2019 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax, the amount of the change order for <br /> the changes described in Exhibit A represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract <br /> price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts, Washington State sales tax, if applicable to the <br /> Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> 4: \; )\(-19--------- L._9 (141461 <br /> C I� (14 �I'/moi , '_l <br /> ayor er0-{gym City Clerk City Attorney <br /> Date: Date:444/4___ !. e: <br /> .-// <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> 0--h/ d-- <br /> Date: 6-/r/f Date: Date: Da e: is -42.-( <br /> Page 2 of 3 <br />