My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:05 AM
Creation date
7/17/2019 10:32:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
6/19/2019
Department
Public Works
Department Project Manager
RICHARD HEFTI
Subject / Project Title
WATER MAIN REPLACEMENT T
Public Works WO Number
UP3684
Amendment/Change Order
Change Order
Amendment/Change Order Number
3
Tracking Number
0001600
Total Compensation
$29,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc 12/27/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Watermain Replacement "T" <br /> Change Order No.3 <br /> Change Order Effective Date: June 5, 2019 <br /> CONTRACTOR <br /> By /U! ._ae. Date: 1 QM /772o 9 <br /> Officer <br /> Exhibit A - Description of Changed Work <br /> Schedule A <br /> This Change Order No. 3 modifies one (1) existing bid item to Schedule A of the Contract as shown <br /> below. <br /> Modified Bid Items <br /> Bid Item #A-40—Crushed Surfacing Top Course. Modify existing Bid Item# A-40 entitled, <br /> "Crushed Surfacing Top Course" at the Contract unit price of$58/Ton, by adding 500 tons to the <br /> Contract, resulting in a$29,000.00 increase to the Contract price. <br /> JUSTIFICATION <br /> Schedule A <br /> Bid Item#A-40—Crushed Surfacing Top Course. This bid item overran plan quantity and is being <br /> modified to account for costs for additional quantities of crushed surfacing top course. <br /> Total Cost of Change Order No. 3: $29,000.00 <br /> Contract Time: There is no adjustment to Contract time in Change Order No. 3. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.