My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:00 AM
Creation date
7/17/2019 10:43:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/12/2019
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
WEST MARINE VIEW DRIVE UTILITIES PROJECT
Public Works WO Number
UP3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001487
Total Compensation
-$6,665.37
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc 11/20/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: West Marine View Drive Utilities <br /> Change Order No. 1 <br /> Change Order Effective Date: May 29,2019 <br /> CONTRACTOR • <br /> By 4 Date: 5 /Lei f �j <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> Change Order#1 modifies four(4) existing bid items as follows: <br /> Bid Item #12—Planing Bituminous Pavement. Modify bid item#12 titled,Planing Bituminous <br /> Pavement,by deleting all work under this bid item,resulting in a$4,110.75 reduction in the contract <br /> price. <br /> Bid Item#17—Crushed Surfacing Base Course. Modify bid item#17 titled, Crushed Surfacing <br /> Base Course, by adding 743.79 tons of Crushed Surfacing Top Course at the unit price of$17.25/ton, <br /> resulting in a$12,830.38 addition to the contract price. <br /> Bid Item#18—Control Density Fill. Modify bid item#18 titled, Control Density Fill,by deleting 94 <br /> cubic yards of Control Density Fill at the unit price of$115.00/CY,resulting in a$10,810.00 reduction <br /> in the contract price. <br /> Bid Item #44—Pavement Markings. Modify bid item#44 titled,Pavement Markings, by deleting all <br /> work under this bid item,resulting in a$4,575.00 reduction in the contract price. <br /> The result of making modifications to the four(4) aforementioned bid items is a$6,665.37 reduction to <br /> the contract bid price. <br /> JUSTIFICATION: <br /> Bid Item #12—Planing Bituminous Pavement& <br /> Bid Item#44—Pavement Markings <br /> Work under the above two bid items is being deleted due to the close proximity of the work being <br /> performed on the Grand Avenue Park Bridge project(GAPB),as Interwest Construction crews are <br /> occupying some of the same space to construct the new pedestrian bridge. Once work is nearing <br /> completion on GAPB project, if work is needed on travel lanes of West Marine View Drive under <br /> these two bid items, it will be performed on the Contract for GAPB project. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.