Laserfiche WebLink
Project: West Marine View Drive Utilities <br /> Change Order No. 1 <br /> Change Order Effective Date: May 29, 2019 <br /> Bid Item#17—Crushed Surfacing Base Course. <br /> Bid Item#18—Control Density Fill. <br /> Request for Information,RFI#005, was approved to allow for the substitution and use of Crushed <br /> Surfacing Base Course, in-lieu-of Control Density Fill for pipe bedding, from the pipe invert to the <br /> spring line, during installing of the 30-inch combined sewer and 36-inch storm drain pipes. The <br /> increase in tons of Crushed Surfacing Top Course and decrease in cubic yards of Control Density Fill <br /> from the original bid quantities are reflected in this change order#1 as a result of RFI#005. <br /> CONTRACT TIME: <br /> No additional working days are being added to the contract by change order#1. <br /> Page 4 of 4 <br />