My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:00 AM
Creation date
7/17/2019 10:43:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/12/2019
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
WEST MARINE VIEW DRIVE UTILITIES PROJECT
Public Works WO Number
UP3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001487
Total Compensation
-$6,665.37
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc 11/20/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: West Marine View Drive Utilities <br /> Change Order No. 1 <br /> Change Order Effective Date: May 29, 2019 <br /> Bid Item#17—Crushed Surfacing Base Course. <br /> Bid Item#18—Control Density Fill. <br /> Request for Information,RFI#005, was approved to allow for the substitution and use of Crushed <br /> Surfacing Base Course, in-lieu-of Control Density Fill for pipe bedding, from the pipe invert to the <br /> spring line, during installing of the 30-inch combined sewer and 36-inch storm drain pipes. The <br /> increase in tons of Crushed Surfacing Top Course and decrease in cubic yards of Control Density Fill <br /> from the original bid quantities are reflected in this change order#1 as a result of RFI#005. <br /> CONTRACT TIME: <br /> No additional working days are being added to the contract by change order#1. <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.