RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
>
Contracts
>
Capital Contract
>
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 11:00:26 AM
Creation date
7/17/2019 11:00:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RODARTE CONSTRUCTION INC.
Approval Date
6/12/2019
Department
Public Works
Department Project Manager
DAVE VOIGT
Subject / Project Title
GOLF COURSE STORMWATER CONSTRUCTION
Public Works WO Number
UP3620
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0001067
Total Compensation
$47,238.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 2/14/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Legion Golf Course Stormwater Detention Project <br /> Change Order No. 2 <br /> Change Order Effective Date: May 15, 2019 <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead,or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim,or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> 41101 Q, a(11V) I <br /> 707 City Clerk City Attorne <br /> Date: 7, Date: 0! 1//�//l'j A ' <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) a.plicable) <br /> , ./1.,e,e.e-g— A ,/, <br /> Date: 5"-30.--/p ate: — C VA D te: 5--3t-11 <br /> CONTRACTOR <br /> By Date: 5.-" 3423—LI <br /> Officer <br /> Page 2 of 3 <br />