Laserfiche WebLink
Project: Legion Golf Course Stormwater Detention Project <br /> Change Order No. 2 <br /> Change Order Effective Date: May 15, 2019 <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead,or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim,or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> 41101 Q, a(11V) I <br /> 707 City Clerk City Attorne <br /> Date: 7, Date: 0! 1//�//l'j A ' <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) a.plicable) <br /> , ./1.,e,e.e-g— A ,/, <br /> Date: 5"-30.--/p ate: — C VA D te: 5--3t-11 <br /> CONTRACTOR <br /> By Date: 5.-" 3423—LI <br /> Officer <br /> Page 2 of 3 <br />