Project: Legion Golf Course Stormwater Detention Project <br /> Change Order No. 2 <br /> Change Order Effective Date: May 15,2019 <br /> Exhibit A---Description of Changed Work: <br /> Change Order No. 1 Modifies 1 bid items and adds 5 new items to the contract as stated below: <br /> Revised Existing Bid Item <br /> Bid Item 62-Force Account. Modify bid item 62 entitled "Force Account", to increase contract value <br /> by adding $22,500.00, resulting in a$22,500.00 increase to the contract. <br /> Added Bid Items <br /> New Item 201 –Additional Irrigation Sprinkler Heads. Add new item # 201 entitled, "Additional <br /> Irrigation Sprinkler Heads" at the agreed to per each price of$1,150.00, by adding seven (7) each, <br /> resulting in an $8,050.00 increase to the Contract price. <br /> New Item 202–Repair/Regrade Green 14. Add new item# 202 entitled, "Repair/Regrade Green <br /> 14"at the agreed to Iump sum price of$2,800.00, resulting in a$2,800.00 increase to the Contract <br /> price. <br /> New Item 203–Repair/Regrade Green 13. Add new item #203 entitled, "Repair/Regrade Green <br /> 13"at the agreed to lump sum price of$4,480.00, resulting in a$4,480.00 increase to the Contract <br /> price. <br /> New Item 204–Repair/Regradc Tee 16. Add new item #204 entitled, "Repair/Regrade Tee 16" at <br /> the agreed to lump sum price of$7,616.00, resulting in a $7,616.00 increase to the Contract price. <br /> New Item 205–Repair/Regrade N. Pond to Tee 16. Add new item #205 entitled, "Repair/Regrade <br /> N. Pond to Tee 16"at the agreed to lump sum price of$1,792.00, resulting in a$1,792.00 increase to <br /> the Contract price. <br /> Exhibit B—Justification: <br /> Bid Item 62-Force Account. Additional force account work including but not limited to minor <br /> regrading, erosion related restoration and pond outlet revision. <br /> New Items; 201 Additional Irrigation Sprinkler Heads,202 Repair/Regrade Green 14,203 <br /> Repair/Regrade Green 13,204 Repair/Regrade Tee 16, and 205 Repair/Regrade N. Pond to Tee <br /> 16ns. These are added as compensation for minor revisions to the golf course design and/or repairs due <br /> to settling and erosion. <br /> Exhibit C—Additional Contract Time: <br /> There are no additional working days added for this change order. <br /> Page 3 of 3 <br />