My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
>
Contracts
>
Capital Contract
>
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 11:00:26 AM
Creation date
7/17/2019 11:00:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RODARTE CONSTRUCTION INC.
Approval Date
6/12/2019
Department
Public Works
Department Project Manager
DAVE VOIGT
Subject / Project Title
GOLF COURSE STORMWATER CONSTRUCTION
Public Works WO Number
UP3620
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0001067
Total Compensation
$47,238.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 2/14/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Legion Golf Course Stormwater Detention Project <br /> Change Order No. 2 <br /> Change Order Effective Date: May 15,2019 <br /> Exhibit A---Description of Changed Work: <br /> Change Order No. 1 Modifies 1 bid items and adds 5 new items to the contract as stated below: <br /> Revised Existing Bid Item <br /> Bid Item 62-Force Account. Modify bid item 62 entitled "Force Account", to increase contract value <br /> by adding $22,500.00, resulting in a$22,500.00 increase to the contract. <br /> Added Bid Items <br /> New Item 201 –Additional Irrigation Sprinkler Heads. Add new item # 201 entitled, "Additional <br /> Irrigation Sprinkler Heads" at the agreed to per each price of$1,150.00, by adding seven (7) each, <br /> resulting in an $8,050.00 increase to the Contract price. <br /> New Item 202–Repair/Regrade Green 14. Add new item# 202 entitled, "Repair/Regrade Green <br /> 14"at the agreed to Iump sum price of$2,800.00, resulting in a$2,800.00 increase to the Contract <br /> price. <br /> New Item 203–Repair/Regrade Green 13. Add new item #203 entitled, "Repair/Regrade Green <br /> 13"at the agreed to lump sum price of$4,480.00, resulting in a$4,480.00 increase to the Contract <br /> price. <br /> New Item 204–Repair/Regradc Tee 16. Add new item #204 entitled, "Repair/Regrade Tee 16" at <br /> the agreed to lump sum price of$7,616.00, resulting in a $7,616.00 increase to the Contract price. <br /> New Item 205–Repair/Regrade N. Pond to Tee 16. Add new item #205 entitled, "Repair/Regrade <br /> N. Pond to Tee 16"at the agreed to lump sum price of$1,792.00, resulting in a$1,792.00 increase to <br /> the Contract price. <br /> Exhibit B—Justification: <br /> Bid Item 62-Force Account. Additional force account work including but not limited to minor <br /> regrading, erosion related restoration and pond outlet revision. <br /> New Items; 201 Additional Irrigation Sprinkler Heads,202 Repair/Regrade Green 14,203 <br /> Repair/Regrade Green 13,204 Repair/Regrade Tee 16, and 205 Repair/Regrade N. Pond to Tee <br /> 16ns. These are added as compensation for minor revisions to the golf course design and/or repairs due <br /> to settling and erosion. <br /> Exhibit C—Additional Contract Time: <br /> There are no additional working days added for this change order. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.