My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
>
Contracts
>
Capital Contract
>
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 9:00:41 AM
Creation date
7/19/2019 9:00:38 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
THOMCO CONSTRUCTION
Approval Date
7/15/2019
Department
Public Works
Department Project Manager
TOM FUCHS
Subject / Project Title
NORTH WETMORE STORM WATER SEPARATION
Public Works WO Number
UP3659
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001182
Total Compensation
-$53.27
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction 5/2/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: North Wetmore Storm Water Separation <br /> Change Order No. 1 <br /> Change Order Effective Date: 4-16-19 <br /> CONTRACTOR <br /> Sy Date: 5//37/ <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> This change order#1 modifies three each existing bid items and adds one new item to the contract as <br /> follows: <br /> Modified Bid Items: <br /> • <br /> Bid Item#39—Planing Bituminous Pavement(2-inch Deep). Modify bid item#39 titled, Planing <br /> Bituminous Pavement(2-inch Deep),by deleting work under this item in its entirety. This will result <br /> in a$27,989.22 reduction in the contract price. <br /> Bid Item#40--HMA, CL Yz-inch PG 64-22 For Permanent Trench Patch. Modify bid item#40 <br /> titled, <br /> HMA, CL'/z-inch PG 64-22 For Permanent Trench Patch,by adding 567 tons of HMA, CL 1/2- <br /> inch PG 64-22 For Permanent Trench Patch at the unit price of$112.85 per ton,resulting in a <br /> $63,985.95 contract price increase. <br /> Bid Item#41 —HMA, CL V2-inch PG 64-22 For Overlay. Modify bid item#41 titled,HMA, CL '/2- <br /> inch PG64-22 For Overlay, by deleting work under this bid item in its entirety. This will result in a <br /> $51,300.00 reduction in the contract price. <br /> The net result of modifying the above three bid items results in a contract price decrease of' <br /> ($15,303.20). <br /> Added New Item: <br /> Item# 54—Roadway Excavation,Including Haul. Add new item#54 titled,Roadway Excavation, <br /> Including Haul, by adding 250 cubic yards of Roadway Excavation, Including Haul ®the unit price of <br /> $61.00 per cubic yard,resulting in a$15,250.00 contract price increase. <br /> The net result of modifying the above 3 existing bid items and adding the 1 new item#54 to the <br /> contract,results in a($53.27) decrease in the contract value. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.