My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
>
Contracts
>
Capital Contract
>
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 9:00:41 AM
Creation date
7/19/2019 9:00:38 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
THOMCO CONSTRUCTION
Approval Date
7/15/2019
Department
Public Works
Department Project Manager
TOM FUCHS
Subject / Project Title
NORTH WETMORE STORM WATER SEPARATION
Public Works WO Number
UP3659
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001182
Total Compensation
-$53.27
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction 5/2/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project:North Wetmore Storm Water Separation <br /> Change Order No. 1 <br /> Change Order Effective Date: 4-16-19 <br /> JUSTIFICATION: <br /> Bid Item#39—Planing Bituminous Pavement(2-inch Deep. <br /> Bid Item#41—HMA, CL Y/-inch PG 64-22 For•Overlay. <br /> The above two items are being deleted were intended for the completion of the grind and overlay of the <br /> seven(7)intersections along Wetmore Avenue from 5th street to 1 l'E' Street. Since Wetmore Avenue <br /> between 5th& 11'x'Street(and many of the side streets in this vicinity of North Everett),have many <br /> surface features which warrant a grind and overlay in the not too distant future,the Street Department <br /> will place this section of Wetmore Avenue on its list of roadways to be included on an upcoming <br /> annual Hot Mix Asphalt Overlay Project. This will result in better unit pricing on the price per square <br /> yard of grinding and cost per ton of hot mix asphalt. <br /> Bid Item#40.—HMA, CL E/2-inch PG 64-22 For Permanent Trench Patch <br /> Item# 54--Roadway Excavation, Including Haul. <br /> The above two items are the result of need for a roadway repair item to remove poor subgrade soils <br /> and broken(alligator) asphalt,upon completion of the new storm drainage installation. The removal of <br /> additional asphalt also resulted in the need for additional tons of Hot Mix Asphalt for Permanent <br /> Trench Patch. <br /> CONTRACT TIME: <br /> No additional contract time is being added as a result of this change order 41. <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.