Laserfiche WebLink
Project:North Wetmore Storm Water Separation <br /> Change Order No. 1 <br /> Change Order Effective Date: 4-16-19 <br /> JUSTIFICATION: <br /> Bid Item#39—Planing Bituminous Pavement(2-inch Deep. <br /> Bid Item#41—HMA, CL Y/-inch PG 64-22 For•Overlay. <br /> The above two items are being deleted were intended for the completion of the grind and overlay of the <br /> seven(7)intersections along Wetmore Avenue from 5th street to 1 l'E' Street. Since Wetmore Avenue <br /> between 5th& 11'x'Street(and many of the side streets in this vicinity of North Everett),have many <br /> surface features which warrant a grind and overlay in the not too distant future,the Street Department <br /> will place this section of Wetmore Avenue on its list of roadways to be included on an upcoming <br /> annual Hot Mix Asphalt Overlay Project. This will result in better unit pricing on the price per square <br /> yard of grinding and cost per ton of hot mix asphalt. <br /> Bid Item#40.—HMA, CL E/2-inch PG 64-22 For Permanent Trench Patch <br /> Item# 54--Roadway Excavation, Including Haul. <br /> The above two items are the result of need for a roadway repair item to remove poor subgrade soils <br /> and broken(alligator) asphalt,upon completion of the new storm drainage installation. The removal of <br /> additional asphalt also resulted in the need for additional tons of Hot Mix Asphalt for Permanent <br /> Trench Patch. <br /> CONTRACT TIME: <br /> No additional contract time is being added as a result of this change order 41. <br /> Page 4 of 4 <br />