Laserfiche WebLink
Plan Section 3 <br /> 3.4 Overpass from Grand Avenue Park to Waterfront <br /> A pedestrian overpass from the north Everett neighborhoods directly to the marina area has <br /> long been part of Everett's shoreline access vision. The bridge is currently under <br /> construction and scheduled for completion in 2019. The ped/bike overpass will cross from <br /> the Grand Avenue Park bluff, near 16th Street, over Burlington Northern Santa Fe Railroad <br /> right-of-way, and State Route 529 (W. Marine View Dr.) with a landing point on Port of <br /> Everett property as shown in the artist's rendering below. Funding for the bridge project is a <br /> great example of optimal leveraging of funding opportunities because it will replace <br /> deteriorated underground storm drainage and sewer pipes on landslide prone slopes. <br /> Placing the new pipelines on a utility bridge will make them more accessible for inspection <br /> and maintenance. <br /> ick_ w+ <br /> L ` <br /> 3.5 Existing Marine View Drive Trail <br /> The existing trail long Marine View Drive between the marina and the "Jeld-Wen" site will <br /> remain substantially unchanged. <br /> Shoreline Public Access Plan Update 2019 19 <br />