My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7399
>
Resolutions
>
Resolution 7399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 11:50:58 AM
Creation date
7/22/2019 11:50:32 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
7399
Date
7/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Section 3 <br /> 3.4 Overpass from Grand Avenue Park to Waterfront <br /> A pedestrian overpass from the north Everett neighborhoods directly to the marina area has <br /> long been part of Everett's shoreline access vision. The bridge is currently under <br /> construction and scheduled for completion in 2019. The ped/bike overpass will cross from <br /> the Grand Avenue Park bluff, near 16th Street, over Burlington Northern Santa Fe Railroad <br /> right-of-way, and State Route 529 (W. Marine View Dr.) with a landing point on Port of <br /> Everett property as shown in the artist's rendering below. Funding for the bridge project is a <br /> great example of optimal leveraging of funding opportunities because it will replace <br /> deteriorated underground storm drainage and sewer pipes on landslide prone slopes. <br /> Placing the new pipelines on a utility bridge will make them more accessible for inspection <br /> and maintenance. <br /> ick_ w+ <br /> L ` <br /> 3.5 Existing Marine View Drive Trail <br /> The existing trail long Marine View Drive between the marina and the "Jeld-Wen" site will <br /> remain substantially unchanged. <br /> Shoreline Public Access Plan Update 2019 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.