My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7399
>
Resolutions
>
Resolution 7399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 11:50:58 AM
Creation date
7/22/2019 11:50:32 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
7399
Date
7/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Section 3 <br /> Implementation <br /> The trail along W. Marine View Drive is already largely in place but should be significantly <br /> upgraded by reducing the number of driveways and widening when redevelopment occurs. The <br /> key connection at Bayside Park is not currently funded but should receivepriority. <br /> Completion of the Grand Avenue Park Bridge to the waterfront will be a valuable access point for <br /> pedestrians and bicyclists. <br /> • <br /> View from Grand Ave.Park Bridge <br /> Shoreline Public Access Plan Update 2019 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.