My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/07/17 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/07/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2020 5:25:46 PM
Creation date
7/23/2019 9:16:03 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET i <br />PROJECT TITLE: <br />SR 526 Corridor Improvement <br />X Briefing <br />COUNCIL BILL # <br />Project — Informational <br />Proposed Action <br />Originating Department <br />Public Works <br />Briefing <br />Consent <br />Contact Person <br />Ryan Sass <br />Action <br />Phone Number <br />(425) 257-8942 <br />First Reading <br />FOR AGENDA OF <br />July 17, 2019 <br />Second Reading <br />Third Reading <br />Public Hearing <br />Budget Advisory <br />Initialed by: <br />Department Head <br />Administration <br />Council President <br />Location Preceding <br />Action Attachments Department(s) Approval <br />State Route 526 None <br />None <br />Public Works <br />(Boeing Freeway) <br />Amount Budgeted <br />-0- <br />Expenditure Required <br />-0- <br />Account Number(s): <br />Budget Remaining <br />-0- <br />Additional Required <br />-0- <br />DETAILED SUMMARY STATEMENT: <br />WSDOT will provide an informational briefing to City Council regarding the State Route 526-Corridor <br />Improvements project. This project developed from the City's 2009 Everett Freight Access & Mobility <br />Study and Transportation Element of the Comprehensive Plan. <br />The SR 526 Corridor Improvements project is in the alternatives analysis phase and is identifying <br />improvements that could benefit all modes of transportation on State Route 526 (Boeing Freeway) between <br />State Route 525 (Paine Field Boulevard) and Interstate 5. The project is focused on improving travel times <br />during the peak commute periods, improving freight access to and from the aerospace manufacturing center <br />and the Southwest Everett Industrial Area, and addressing safety. <br />WSDOT has developed concepts with project stakeholders and is preparing to attend neighborhood meetings <br />to inform the public and solicit input. This presentation is to brief City Council on the progress to date and <br />provide a brief history, discuss the findings, and outline the concepts and potential benefits. <br />RECOMMENDATION (Exact action requested of Council): <br />(Informational Briefing; No Action Required) <br />
The URL can be used to link to this page
Your browser does not support the video tag.