My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc 7/9/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Engineering Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 9:48:05 AM
Creation date
7/23/2019 9:47:45 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc
Approval Date
7/9/2019
Council Approval Date
7/3/2019
End Date
6/30/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Update Comprehensive Water Plan
Public Works WO Number
UP3718
Tracking Number
0001899
Total Compensation
$760,233.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FYR <br /> Table of Contents <br /> Introduction 1 <br /> General Assumptions 1 <br /> Task 1 Project Management 1 <br /> Task 2 Data Collection 3 <br /> Task 3 Water System Description 4 <br /> Task 4 Water System Resiliency 5 <br /> Task 5 Service Policies, Plans, and Agreements 7 <br /> Task 6 Water Supply Demand Requirements 8 <br /> Task 7 Conservation Program 9 <br /> Task 8 Water Rights and Water Source Reliability 11 <br /> Task 9 Water Yield Analysis 12 <br /> Task 10 Watershed Control Program 15 <br /> Task 11 Planning Data Memorandum 16 <br /> Task 12 Transmission and Distribution System Analysis 17 <br /> Task 13 Regulatory Compliance Program 23 <br /> Task 14 Operations and Maintenance 24 <br /> Task 15 Design and Construction Standards and Specifications Update 25 <br /> Task 16 Capital Improvement Plan 26 <br /> Task 17 Financial Plan 27 <br /> Task 18 CWP Document Production 28 <br /> Task 19 Unidentified Services 30 <br /> Everett Comprehensive Water Plan June 12, 2019 <br /> Exhibit A—Scope of Services Page i <br />
The URL can be used to link to this page
Your browser does not support the video tag.